Which three recommended actions can be released from the Planners Workbench?
Select three correct calendars from among the list that are used by the ASCP engine during planning and scheduling.
Your client Is currently using a Constrained Plan In Production. The client states that the Inventory Turn Index remains below Its target and feels that an optimized plan would allow them to Improve their Inventory turns.
You Instruct the client that there are some additional setups required for the Optimized Plan to give meaningful results.
Identify the three setups that you would recommend as the minimum for an Optimized Plan to give credible results.
When analyzing an ASCP plan in the Exception Details form (Supply Chain Plan > Workbench > Actions tab > drill down on an Action type), the column named Quantity Satisfied By Due Date Is showing a value.
Which statement is NOT correct with reference to Partial Demand fulfillment?
The planning engine provides the detailed bills of material (BOM) and Routing information associated with an Item from the Planner workbench.
You right-click and item in the Navigator and select BOM/Routing. The shortcut menu displays some options to further navigate to specific information.
Which two option are NOT displayed?