Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

Note! Following 5V0-31.20 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

5V0-31.20 Exam Dumps - VMware Cloud Foundation Specialist

Go to page:
Question # 4

An Architect is commission hosts with a Multi-NIC configuration where Management and vMotion traffic are assign to a vSphere Distributed Switch with 2 uplinks.

What is one advantage to using VLAN-banked traffic to the physical switches from the vSPhere Distributed Switch?

A.

Layer 2 hashed-based Equal Cost Muto-Pathing (ECMP) out of hypervisor

B.

Bandwidth in the rack is optimized (no inter-switch-link)

C.

Two physical NICs of the hypervisor are actively used

D.

More complex to implement

Full Access
Question # 5

What is the maximum recommended MTU value for all non-management VLANs within VMware Cloud Foundation?

A.

MTU 15000

B.

MTU 15000

C.

MTU 9000

D.

MTU 16000

Full Access
Question # 6

Which set of options is acceptable for vSAN Failures to Tolerable (FTT) policy when creating a VI Workload Domain from UI?

A.

FTT=0, 1, or 2

B.

FTT=0, 1,2, or 3

C.

FTT=0, 1,5,or 6

D.

FTT= 1, 2, or 3

Full Access
Question # 7

An administrator did not deploy and configure Application Virtual Networks (AVN) during the initial VMware Cloud Foundation bring-up process. Which statement is correct?

A.

AVN disablement is not possible during the VMware Cloud Foundation bring up process

B.

Cloud Foundation bring-up will fail since AVN is required to property configure Management Domain.

C.

AVN deployment is disabled by default and must be enabled right after the VMware Cloud Foundation bring up process

D.

vReafize Suite components must be deployed to VLAN-backed distributed port group.

Full Access
Question # 8

An architect is tasked with designing a new VMware Cloud Foundation environment. The company will purchase vSAN Ready Nodes for the management cluster but wants to make use of existing investments where possible, including a significant investment made recently in an all-flash storage array and 16GB FC fabric. The design must include this array wherever possible.

The company wishes to reuse existing ToR switching that will provide four 10GPs Ethernet connection to each host and one 1Gbps out of band connection. The network will be a standard spine and leaf topology with no layer-2 shared between racks of infrastructure. The ToR switches are each connected to 4 spine switches, with one 10Gbps connection. The clusters must be spread across at-least four racks to ensure maximum resiliency.

Which two constraints impact this design? (Choose two )

A.

The use of an existing storage array.

B.

VMFS does not support FC SAN with VMware Cloud Foundation

C.

More than one availability design is needed.

D.

The management domain must be contained within one rack.

E.

A spine and leaf topology is used.

Full Access
Go to page: