Special Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

Note! Following 010-151 Exam is Retired now. Please select the alternative replacement for your Exam Certification. The new exam code is 800-150

010-151 Exam Dumps - Supporting Cisco Datacenter Networking Devices

Go to page:
Question # 17

Which type of optics module is supported by a 12-port 100 GE Cisco Nexus 7700 F3 Series I/O module?

A.

CPAK

B.

QSFP+

C.

SFP/SFP+

D.

CFP

Full Access
Question # 18

Which two statements about PCIe are true? (Choose two.)

A.

The PCIe link is built around dedicated unidirectional couples of serial, point-to-point connections known as lanes.

B.

You can install a PCI Express x8 adapter into an x4 slot.

C.

The PCIe standard is a bus-based system in which all the devices share the same bidirectional, 32-bit or 64-bit, parallel signal path.

D.

The PCIe 1.0 standard doubles the transfer rate compared to PCIe 2.0.

E.

A link that is composed of four lanes is called an x4 link.

Full Access
Question # 19

On which three devices can the Host Upgrade Utility be performed? (Choose three.)

A.

C420

B.

C230

C.

B230

D.

B210

E.

C210

F.

B460

G.

C240

Full Access
Question # 20

What is the maximum distance that the 40GBASE-LR4 Ethernet standard can span?

A.

550 m

B.

10 km

C.

40 km

D.

80 km

Full Access
Question # 21

How many 10GBASE-T port licenses are preinstalled on a Cisco Nexus 3064-32T?

A.

16

B.

32

C.

48

D.

64

Full Access
Question # 22

Which command syntax is correct to reset the admin password when the switch is in the kickstart prompt?

switch(boot) #"

A.

exec -> admin-password

B.

connect local-mgmt -> admin-password

C.

configure terminal -> admin-password

D.

connect nxos -> admin-password

E.

admin-password

Full Access
Question # 23

Which three statements about powering down a Cisco UCS C-Series Rack-Mount Server to perform maintenance or replacement are true? (Choose three.)

A.

Standby power mode: Power is supplied only to the service processor and the cooling fans, and it is safe to power off the server from this mode.

B.

Power status LED. Green indicates that the server is in main power mode and can be safely powered off.

C.

Graceful shutdown: Press and release the power button. The operating system performs a graceful shutdown, and the server goes to standby mode, which is indicated by an amber power status LED.

D.

Disconnect the power cords from the power supplies in your server to completely power off the server.

E.

Only an emergency shutdown can be performed using the power button on the server front panel.

F.

The Cisco UCS C-Series Rack-Mount Server has only one power mode.

Full Access
Question # 24

To confirm the installation of a B-Series Server, which GUI based management tool will be used?

A.

Windows 10

B.

UCSM (UCS Manager)

C.

Console Access

D.

CIMC (Cisco Integrated Management Controller)

Full Access
Go to page: