Special Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

1z0-1042-24 Exam Dumps - Oracle Cloud Infrastructure 2024 Application Integration Professional

Go to page:
Question # 4

You have an Oracle Integration (OIC) synchronous integration flow that updates external systems with several invocations. However, several of your OIC integration clients are reporting that they are experiencing timeouts waiting for the response confirmation from this processing. Which is a legitimate strategy to mitigate this issue?

A.

Change the implementation logic to invoke multiple fine-grained external API calls within a single loop.

B.

Change the design implementation strategy to an asynchronous flow that provides a separate notification to clients when the processing is complete.

C.

Increase the blocking timeout within the OIC integration settings to allow for extended time.

Full Access
Question # 5

Which Oracle Integration (OIC) adapter can be used to create a configured connection within an integration allowing you to send a file to the embedded File Server associated within the same OIC environment?

A.

File Adapter

B.

Local Adapter

C.

FTP Adapter

D.

REST Adapter

Full Access
Question # 6

You are an Oracle Integration Cloud (OIC) specialist working on a project to integrate two systems using OIC. During testing, you notice that the integration instance fails to execute and returns an error message. Which step would you take first to troubleshoot the issue?

A.

Check the instance logs for specific error messages and details.

B.

Increase the number of instances to handle the error.

C.

Immediately restart the integration instance.

D.

Contact Oracle Support and wait for a response.

Full Access
Question # 7

Which is NOT an available option while configuring an ERP Cloud Adapter to use in an Oracle Integration Cloud (OIC) integration?

A.

Invoke CRUD operation on ERP Cloud REST API

B.

Upload files to UCM

C.

Extract Bulk Data from ERP Cloud

D.

Enable Callback.

Full Access
Question # 8

GlobalTech Corporation uses Oracle Integration Cloud (OIC) to synchronize data between their CRM and ERP systems. They currently have a scheduled integration that runs nightly at 3 AM. With the implementation of a new CRM system that supports real-time data synchronization, GlobalTech wants to update their ERP system immediately after any data changes in the CRM. To achieve this, they need to convert their scheduled integration to an app-driven integration, allowing the CRM system to trigger the integration upon data changes. When implementing this conversion, which of these considerations is NOT valid?

A.

You must choose an existing REST adapter trigger connection resource.

B.

You cannot convert a scheduled integration to a REST adapter-triggered integration with multiple verbs.

C.

Any existing scheduled parameters will be automatically converted to integration properties.

D.

You cannot convert a scheduled integration with assignments that have the fault data type.

Full Access
Go to page: