Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

Note! Following 2V0-602PSE Exam is Retired now. Please select the alternative replacement for your Exam Certification.

2V0-602PSE Exam Dumps - VMware vSphere 6.5 Foundations (IT Academy Student)

Go to page:
Question # 49

A virtual machine loses network connectivity after vMotion.

Which two troubleshooting tasks can be performed? (Choose two.)

A.

Verify virtual switch option Notify Switches is set to Yes.

B.

Ensure that Enhanced vMotion Compatibility has been configured.

C.

Change the teaming policy to active/standby mode.

D.

Ensure that the virtual machine is in the proper VLAN ID.

Full Access
Question # 50

Which two options are requirements to perform a migration between vCenter Server instances? (Choose two.)

A.

The vCenter Server servers must be time-synchronized.

B.

The ESXi hosts must be version 5.5 or later.

C.

The vCenter Servers must be version 6.0 or later.

D.

The vCenter Server must be in the same single Sign-On domain.

E.

The ESXi hosts must have vSphere Standard, Advanced, or Enterprise Plus licensing.

Full Access
Question # 51

Which virtual SCSI controller would be recommended when deploying a Windows Server 2012 R2 VM that will host a database server which is expected to generate high I/O?

A.

LSI Logic

B.

PVSCSI

C.

LSI Logic SAS

D.

BusLogic

Full Access
Question # 52

When trying to export the vApp to the OVF, the option is grayed out.

What solution allows for the export of a vApp?

A.

PowerOff the vApp.

B.

The vApp is marked as Non-Exportable.

C.

Logout of the vSphere Client and use the vSphere WebClient.

D.

Change the portgroup where the VMs are connected to.

Full Access
Question # 53

What is required to create a vSphere Distributed Switch? (Choose two.)

A.

A minimum of two physical uplinks is required.

B.

vSphere Enterprise Plus licensing is required.

C.

The host is added to a vCenter Server.

D.

Login to the ESXi Host with the Root account.

Full Access
Question # 54

When adding a new VLAN to an existing virtual distributed switch, which three steps are necessary? (Choose three.)

A.

Right click the vDS and select Distributed Port Group, then select New Distributed Port Group.

B.

Right click on the data center, select Distributed Switch, select New Distributed Switch.

C.

Specify the VLAN ID and VLAN type.

D.

Provide a name for the Distributed Port Group.

E.

Specify the number of physical uplinks form the vDS to the VLAN.

Full Access
Question # 55

Some of the VMs in a vSphere DRS cluster are not migrated as expected.

Which three factors can affect DRS behavior? (Choose three.)

A.

The currently configured TPS settings for the VMs.

B.

VM Overrides.

C.

DRS Aggression Levels (Migration Threshold).

D.

CPU, Memory, and Network Utilization.

E.

The currently configured Enhanced vMotion Compatibility level for the cluster.

Full Access
Question # 56

Which three actions are available in Troubleshooting Mode in the ESXi Direct Console User Interface (DCUI)? (Choose three.)

A.

Enable ESXi Shell.

B.

Modify DCUI idle timeout.

C.

Modify Password.

D.

Restart Management Network.

E.

Modify SSH timeout.

Full Access
Go to page: