Question # 65

A data center uses Cisco Nexus 7000 Series Switch and contains two tenants, tenant A and tenant B.

    Tenant A uses IP addresses in the 10.2.30.41/24 to 10.2.30.64/24 range.

    Tenant B uses IP addresses in the 10.2.30.120/24 to 10.2.30.192/24 range.

The engineer must implement a solution that

    Isolates the traffic for each tenant as separate routing data and control planes.

    Physically partitions the Cisco Nexus device into separate multiple logical devices with separate management, failure domain isolation, and resource management.

Which two technologies meet these requirements? (Choose two.)

A.

VDC

B.

vPC

C.

VXLAN

D.

VLAN

E.

VRF

Full Access
Question # 66

Refer to the exhibit.

A high-availability setup for iSCSI is designed with the host running ISCSI software. Each storage port on the MDS exports the same two Fibre Channel target ports with different ISCSI target names. In this design, how many ISCSI session are created from the host so that recovery occurs if any component fails?

A.

2

B.

3

C.

4

D.

5

Full Access
Question # 67

Refer to the exhibit. A Cisco engineer is configuring a data center design scenario with Cisco MDS 90Q0 Series Switches. The cut-through routing mode is chosen for impf oved read operation performance. Each (SCSI host requires access lo storage through the IPS module. First, the engineer configures the TCP tuning parameters as enabled SACK, the maximum bandwidth of 1 Gbps. buffer size of 4096. keepalive timeout at 1s. and enables Path MTU. Then, the engineer must set the OoS of the ISCSI link. What is the maximum QoS value that must be set tor the ISCSI session?

A.

3

B.

1

C.

63

D.

5

Full Access
Question # 68

Refer to the exhibit. A Cisco engineer is planning a data migration job in heterogeneous SANs where the existing and new storage devices for the migration are already connected to the MDS switches. All paths from the SSM to the storage-connected switch are going through the Cisco fabric. The setup is with active/active arrays and multiple LUN sets. What is the best approach to copy the LUN sets to the new location?

A.

Enable synchronous replication for the new storage array.

B.

Add all paths Fabric-A zones to Fabric-B zones.

C.

Create two data migration jobs, and add two storage pons in each job.

D.

Grant access to all servers to the existing data sets.

Full Access
Question # 69

A network architect needs secure access to the organization’s perimeter routers and firewalls. The administrator must access network devices from a remote location that is reachable from the WAN cloud Which action meets these requirements?

A.

Create a secure IPsec tunnel interface using an internet link for device management purposes

B.

Enable the SSH protocol with a strong username and password using an internet link for management purposes

C.

Create an out-of-band network management network

D.

Create an in-band network management network

Full Access
Question # 70

An architect is gathering technical requirements tor a large-scale data center with up to 3000 Ethernet ports and 70 ToR switches. The stakeholders agreed that it a ToR switch becomes compromised via its management plane, access to the production data plane must not be possible tram that switch. Which type of management network must the architect recommend in the design?

A.

out-of-band dialup

B.

in-band Ethernet

C.

out-of-band Ethernet

D.

in-band dialup

Full Access
Question # 71

Which two naming formats identify target or initiator iSCSI nodes? (Choose two.)

A.

WWPN

B.

EUI

C.

IQN

D.

WWN

E.

OUI

Full Access
Question # 72

A network administrator must create a redundant vHBA for the mission-critical virtual machines (VMs) installed on a Cisco UCS Fabric Interconnect blade server. The VMs access multiple datastores using VSAN55 and VSAN95. The datastore on which the VMs are hosted must be accessible if any of the uplinks goes offline. Which action meets these requirements?

A.

Attach VSAN55 to vHBA1 and VSAN95 to vHBA2.

B.

Assign VSAN55 and VSAN95 to vHBA1 and vHBA2.

C.

Enable failover for the vHBA with VSAN55 and VSAN95 enabled.

D.

Configure load-balancing for vHBAs with VSAN55 and VSAN95 attached.