Black Friday Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

Note! Following 3601 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

3601 Exam Dumps - Avaya Virtual Services Platform 9000 Maintenance and Troubleshooting Exam

Question # 4

Which practice does Avaya highly recommend to reduce the load on the Packet Capture Tool (PCAP) engine?

A.

Use PCAP with IP or MAC filters.

B.

Increase the size of the PCAP buffer.

C.

Enable PCAP on the same port as Port Mirroring.

D.

Capture packets ontheegressport Instead of on the ingress port.

Full Access
Question # 5

Where is the VSP 9000 log file configured?

A.

Menu

B.

ACLI

C.

Syslog

D.

Sysconfig log menu

Full Access
Question # 6

VSP 9000 fast re-route technology extends over the IST to include all of the local and remote ports in the switch pair. How are link state message carried between the switch pair?

A.

with FDR entries

B.

using peer IP addresses

C.

over SMLT ports

D.

over the IST ports

Full Access
Question # 7

Buffer wrap is a variable of the Packet Capture Tool (PCAP) enable command, and by default it is set to true. Which statement describes what buffer-wrap does when it is set to true?

A.

Itenables external flash wrap around.

B.

It wrapscaptured frames to the DRAM buffer.

C.

It stops packet rapture when the buffer becomes full.

D.

It allows the capture to continue when the buffer becomes full.

Full Access
Question # 8

During a software image upgrade, how does the VSP 9000 identify the release to be activated?

A.

The switch reads the release info from the load ID.

B.

The switch reads the release information from the zip file metadata.

C.

The technician uses the command software patch add "release name".

D.

The technician uses the command software activate "Release Name".

Full Access
Question # 9

With an ACL being identified by a unique system wide ACL ID in the range of 1-2048, what does the number 2048 represent?

A.

the maximum enabled ACLs for the VSP 9000

B.

the maximum supported ACLs for the network

C.

the maximum supported ACLs for the VSP 9000

D.

the maximum supported ACLs and ACEs for the network

Full Access
Question # 10

The network was scheduled for some additional network configuration in the distribution and core switch clusters. The engineer completed the configuration and tested the additional VLANs, along with IP addressing and dynamic routing. All of the tests passed for the new addition in the core, distribution and the edge. A few days later a service rail was logged with the service center regarding the recently added changes to the network. The clients in the new subnet are unable to connect to the new service. Which tools and techniques should be used to resolve the problem?

A.

The first test is to do a ping test to the source and destination from any station in the network.

B.

The firsttest is to examine the Forwarding Data Base (FDB) on all of the switches between the source and destination.

C.

Review the problem statement, and gatherinformation on wh3t is working and what is notworking.

D.

Always review the logs forthe core,distribution and edge devices looking for traps.

Full Access