Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

Note! Following C_FSUTIL_60 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

C_FSUTIL_60 Exam Dumps - SAP Certified Associate - Utilities with SAP ERP 6.0

Question # 4

You use parallel processing to execute the dunning proposal. A variant for object VKONT is used with interval size 1000 and the number of intervals as 1000.

Which of the following is a result of the batch scheduling process?

A.

Each interval will generate 1000 dunning activities.

B.

Only one interval has less than 1000 accounts.

C.

All intervals will finish processing at the same time.

D.

All intervals will start processing at the same time.

Full Access
Question # 5

Before you executed meter reading order creation, you established the appropriate control functions to influence the order creation process.

Which control function can you specify for order creation?

A.

Definition of parallel processing object

B.

Meter reading document consistency check

C.

Specification of meter reading reason

D.

Meter reading interval check

Full Access
Question # 6

What is the valid sequence for processing scheduled meter readings?

A.

1. Create orders

2. Download meter reading data

3. Perform meter readings

4. Upload meter reading results

5. Validate meter readings

B.

1. Create orders

2. Download meter reading data

3. Perform meter readings

4. Validate orders

5. Upload meter reading results

C.

1. Create orders

2. Perform meter readings

3. Output orders

4. Upload orders

5. Validate meter readings

D.

1. Output orders

2. Download meter reading data

3. Perform meter readings

4. Validate orders

5. Upload orders

Full Access
Question # 7

A customer integrates with an automated meter reading operation system.

Which point of delivery role must be selected to enable communication with this system?

A.

Energy quantity settlement point of delivery

B.

Deregulation point of delivery

C.

Point of delivery ID

D.

Technical point of delivery

Full Access
Question # 8

A housing cooperation builds a new apartment complex with 10 units. Each apartment is individually provided with electricity and is expected to be billed separately. The electricity company requires that all meters measure on and off-peak consumption. All meters should be centrally installed.

What is the minimum number of data objects you need to create?

A.

• 10 Device locations

• 10 Register groups

• 20 Registers

• 10 Devices

• 1 Premise

B.

• 10 Device locations

• 10 Register groups

• 10 Registers

• 20 Devices

• 1 Premise

C.

• 1 Device location

• 1 Register group

• 1 Register

• 20 Devices

• 10 Premises

D.

• 1 Device location

• 1 Register group

• 2 Registers

• 10 Devices

• 10 Premises

Full Access
Question # 9

What is the required technical master data for the SAP IS-U move-in?

A.

• Connection object

• Installation

• Premise

B.

• Contract account

• Installation

• Premise

C.

• Contract

• Installation

• Premise

D.

• Connection object

• Installation

• Device

Full Access
Question # 10

A landlord complains that the service was not activated in their name after the tenant moved out.

What could be the reason?

A.

The device was not allocated to the property.

B.

The earliest start date has been reached.

C.

Automatic owner move-out was not maintained.

D.

Event creation was not set in the property.

Full Access
Question # 11

Which objects are maintained in both SAP CRM and SAP ERP? (Choose two)

A.

Contract account

B.

FICA document

C.

Point of delivery

D.

Installation

Full Access
Question # 12

You have created the following master data:

• Connection object

• Premise

• Installation

• Point of delivery

• Device location

• Register group

• Device category

• Device info record

When you try to do a full installation, you receive a system error.

What would most probably be the cause of the error in this scenario?

A.

The installation is not billing-relevant.

B.

Technical installation is not possible.

C.

There is no contract assigned to the installation.

D.

A valid business partner is missing.

Full Access