Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

Note! Following C_IBP_2302 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

C_IBP_2302 Exam Dumps - SAP Certified Application Associate - SAP IBP for Supply Chain (2302)

Question # 4

You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.

A.

Units of measure are usually not time-dependent.

B.

Unit of measure is an attribute of a master data type, such as Product.

C.

Units of measure are usually not time-independent.

D.

Analytics provide the user with the option to select the target unit ofmeasure.

E.

Conversion to the target unit of measure is handled by SAP IBP Excel UI

Full Access
Question # 5

What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

A.

Created as type NVARCHAR and assigned to an external master data type

B.

Created as type INTEGER and assigned to a compound master data type

C.

Created astype INTEGER and assigned to a simple master data type

D.

Created as type DECIMAL and assigned to a compound master data type

Full Access
Question # 6

You are setting upplaning with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

A.

Lot sizes are applicable for production and handling quantities.

B.

Periodic lot size setting overridesthe minimum lot size.

C.

Lot sizes are time-independent master data settings.

D.

Lot sizes are applicable for production and transportation quantities.

Full Access
Question # 7

Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

A.

Configuration items should be bundled in the collections basedon the SAP IBP project stream.

B.

A planning area with its time profile must be bundled in one collection.

C.

A planning area with the copy operators assigned must be bundled in one collection.

D.

You should delete collections after they have been transported.

Full Access
Question # 8

For which of the following application jobs can you enter planning filters as parameters?Note: Thereare 2 correct answers to this question.

A.

Purge Master Data

B.

Create Time Periods for Time Profiles

C.

Purge Key Figure Data

D.

Purge Non-Conforming Data

Full Access
Question # 9

You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2correct answers to this question.

A.

Capacity leveling will be possible for production and storage resources.

B.

Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.

C.

Excess stock can be generated and willneed to be staged in an overflow warehouse.

D.

Minimum capacity utilization will result in pull production occurring.

Full Access
Question # 10

You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which ofthe following parameters can you model to plan production with extra shift(s)?

A.

Capacity expansion with additional costs

B.

Adjusted production interactive values

C.

Incremental production values

D.

Production source validity at the start of seasonal peak

Full Access
Question # 11

Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

A.

A special key figure marked as an aggregate key figure (aggregate constraint)

B.

A currency conversion key figure, such as exchangerate

C.

A unit of measure key figure, such as UOMCONVERSIONFACTOR

D.

A forecast metric key figure, such FCSTMAPE

Full Access
Question # 12

Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

A.

Demand Driven Replenishment

B.

Response Planning

C.

Sales and Operations Planning

D.

Inventory Optimization

E.

Demand Sensing

Full Access