New Year Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

Note! Following C_TS411_2021 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

C_TS411_2021 Exam Dumps - SAP Certified Application Associate - SAP S/4HANA R&D Engineering

Go to page:
Question # 4

Which prerequisites must be fulfilled before a configuration profile can be created and released for a configurable material?

A.

At least one variant class must be assigned to the configurable material. Values must be assigned to the characteristics here.

B.

At least one variant class must be assigned to the configurable material.

C.

At least one variant class must be assigned to the configurable material. Values must not be assigned to the characteristics here.

D.

Exactly one variant class must be assigned to the configurable material.

Full Access
Question # 5

Which secure storage areas can be used inside a document info record?Note: There are 2 correct Answers to this question.

A.

HTTP Content Server

B.

FTP File Server

C.

SAP Database

D.

RFC Archive

Full Access
Question # 6

Which special feature must be taken into account for the material master of material variants for use in logistics?

A.

The material master requires a link to the configurable material at sales area level.

B.

The material master at client level requires the indicator that it can be configured.

C.

The material master requires a connection to the configurable material at client level.

D.

The material master requires a link to the configurable material at plant level.

Full Access
Question # 7

What is the advantage of the Engineering Workbench in comparison to standard material BOM and routing maintenance?Note: There are 3 correct Answers to this question.

A.

Material BOMs, routings, work centers, and material masters can be created and changed.

B.

Material BOMs and routings can be processed together.

C.

Only the Engineering Workbench allows you to make changes to material BOMs and routings using Engineering Change Management.

D.

You can save changes to material BOMs and/or routings and release them for other persons without leaving the Engineering Workbench.

E.

Using a special, optional lock logic, several people can make changes to the same material BOMs and/or routings.

Full Access
Question # 8

For which configuration processes/scenarios can you also do a multi-level configuration in sales orders, if there are no sales-relevant items in the BOM available?Note: There are 2 correct Answers to this question.

A.

Order BOM

B.

Sales Order (SET processing)

C.

Planned/Production Order with BOM explosion

D.

Planned/Production Order without BOM explosion

Full Access
Go to page: