Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

CPIM-ECO Exam Dumps - Execution and Control of Operations

Go to page:
Question # 9

Objectives of implementing a work cell include which of the following outcomes?

A.

Increasing worker satisfaction

B.

Organizing resources by raw material type

C.

Implementing standard work

D.

Sharing common equipment

Full Access
Question # 10

A reduction in the lead time results from which of the following actions?

A.

Increase in work-in-process, increase in throughput

B.

Increase in work-in-process, decrease in throughput

C.

Decrease in work-in-process, increase in throughput

D.

Decrease in work-in-process, decrease in throughput

Full Access
Question # 11

The utilization of a downstream nonbottleneck resource is determined by:

A.

a bottleneck resource.

B.

theoretical capacity.

C.

available capacity.

D.

standard hours available.

Full Access
Question # 12

Which of the following statements about the MRP due date for a shop order is true?

A.

It is the same as operation priority.

B.

It is used in deriving operation priority.

C.

It is established at order release time and frozen until order completion.

D.

It is equal to the due date plus 5 "M" days.

Full Access
Question # 13

During the define phase of a six sigma project, which of the following activities takes place?

A.

Describe and chart the process being considered

B.

Determine the possible failure modes

C.

List the proven root causes of the problem

D.

Determine the scope of the project

Full Access
Question # 14

The next job to be performed was selected because it had the least amount of operation time prior to the due date. Which of the following priority sequencing rules was being used?

A.

Slack time per operation

B.

Shortest operation time

C.

Critical ratio

D.

Slack time per order

Full Access
Question # 15

Which of the following methods is used to control variation to improve product quality?

A.

Short-cycle manufacturing

B.

Cycle counting

C.

Buffering inventory

D.

Design for manufacturability

Full Access
Go to page: