Easter Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

CT-PT Exam Dumps - ISTQB Certified Tester - Performance Testing

Go to page:
Question # 9

What challenge must be considered when using crowds to emulate load generation?

A.

The load generation will be difficult to reproduce.

B.

The load generation method is less sensitive to changes in the III.

C.

This type of load generation is more suitable for mainframe applications.

D.

This technique is more precise than other methods of load generation.

Full Access
Question # 10

At what point during performance testing does monitoring with the load testing tool begin?

A.

When testing is concluded.

B.

Before testing execution.

C.

Immediately after test execution.

D.

Simultaneously with test execution.

Full Access
Question # 11

Which of the following is a major contributor to unreliable performance projections?

A.

Redundancy between the test and production environments

B.

Disagreement between the technical and business stakeholders during analysis

C.

Differences in the hardware between the test and production environments

D.

Business stakeholders setting unrealistic performance goals

Full Access
Question # 12

Which of the following is typically the result of oversaturation of system resources during performance testing?

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Full Access
Go to page: