Question # 41

A major Caribbean bank typically develops their own banking software using an Agile methodology. However, for some specific components COTS software is acquired and used. The bank does not want to create a dependency on any external COTS supplier.

As part of the test approach, portability testing will be performed. Which portability sub-characteristic is especially relevant for the Caribbean bank?

A.

In stall ability

B.

Adaptability

C.

Replaceability

D.

Co-existence

Full Access
Question # 42

Consider the pseudo code for the Answer program:

Which of the following statements about the Answer program BEST describes the control flow anomalies to be found in the program?

A.

The Answer program contains no control flow anomalies.

B.

The Answer program contains unreachable code.

C.

The Answer program contains unreachable code and an infinite loop.

D.

The Answer program contains an infinite loop.

Full Access
Question # 43

Which of the following is a true statement regarding a continuous integration environment?

A.

Builds are done regularly every night

B.

Automation tools are used to verify the results of the build

C.

Unit testing is performed manually by the developers prior to code check in

D.

Performance efficiency testing is conducted for every accepted build

Full Access
Question # 44

At which test level would reliability testing most likely be performed?

A.

Static testing

B.

Component testing

C.

System testing

D.

Functional acceptance testing

Full Access
Question # 45

You are an experienced tester on an Agile team that is producing a new application. The product backlog has been refined sufficiently to begin development for the first release. This stories in this backlog contain a mixture of functional and non-functional requirements, as well as some technical stories that will provide elements of the application's infrastructure The developers have decided to use TDD as a deveiopment approach but automation of the acceptance tests is not yet planned.

You have been asked to recommend whether or not the team should take an atdd approach as well as TDD. what would be the BEST recommendation in these circumstances?

SELECT ONE OPTION

A.

YES. use attd, but for the functional requirements only because it cannot be applied to non-functional or technical requirements.

B.

YES. use ATTD for all requirements including non-functional and technical stories.

C.

NO. do not use ATDD, because it will not work when the acceptance tests are not automated

D.

NO. do not use atdd. because it is not compatible with the developers' TDD approach.

Full Access
Question # 46

Which of the following is a common technical issue that causes automation projects to fail to meet the planned return on investment?

A.

Insufficient planning for usability

B.

Failing to design for maintainability

C.

Designing for keyword-driven use

D.

Using capture-playback to do the initial capture of the window objects

Full Access
Question # 47

A new web site has been launched for a testing conference. There are a number of links to other related web sites for information purposes. Participants like the new site but complaints are being made that some (not all) of the links to other sites do not work.

Which type of test tool is most appropriate in helping to identify the causes of these failures?

A.

Review tool

B.

Hyperlink tool

C.

Static analysis tool

D.

Dynamic analysis tool

Full Access
Question # 48

Subject to testing is a software system (COTS) for Project Administration and Control (PACS). PACS is a multi-project system for controlling the project time, e.g., in terms of scheduling and tracking, and managing the productivity of projects, e.g., in terms of effort and deliverables.

During various interviews with stakeholders the following information was gathered:

• Using PACS is not business critical. There is no impact such as high financial losses or problems to the operational continuity of an organization. Its application is not critical since the software package does not support directly the operational, or the primary, business processes of an organization. It supports (project) management in the project planning and tracking process. Of course, it will be highly annoying for users if the system “goes down” from time to time. Although this does not have a high impact for the business process as a whole, the Mean Time Between Failures (MTBF) still needs to be at a good level to be successful in the market.

• Users of PACS typically have an academic educational level, but have no prior experience with this particular type of project management software. The system will be used by a large number of users within an organization.

• The system will be used on a regular basis, e.g., several times per day by project managers and several times per week by project employees. This means that the system will not be used very intensively, often only for some data input or an information request. Its usage is not considered to be very time-critical.

• The data is recorded on-line and real-time. The system is expected to run in multiple hardware environments in various network environments. It is also expected that changes in the operational environments will happen in the upcoming period that also need to be supported.

Based on the information provided by the stakeholder, which combination of non-functional quality characteristics should you propose to test as part of your test approach?

A.

Reliability and Portability

B.

Security and Reliability

C.

Performance efficiency and Portability

D.

Reliability and Performance efficiency