Question # 9

User Story: As a user I want to be able to calculate tax percentage based on amount of income.

What is the best black box test design technique for verifying the accuracy of this user story?

A.

Statement testing - test all statements in income calculation.

B.

User story testing - test that the user can enter an income amount and get a result.

C.

State transition testing - test all states of income entry.

D.

Equivalence partitioning - test with low, medium and high income.

Full Access
Question # 10

Which of the following is a risk that continuous integration introduces?

A.

Teams sometimes over-rely on unit tests and exclude some important system and acceptance tests.

B.

Testers sometimes have too many builds to test, which reduces the quality of testing.

C.

Teams no longer have the ability to run manual tests, as all tests must be automated.

D.

Developer's workload is increased, which can result in a reduction of output.

Full Access
Question # 11

In a sprint planning, the product owner presents a user story written on a card. The team starts having a discussion with the product owner to get an understanding on how the software should work.

The user story written on the card is:

"As a customer, I want to subscribe to the mailing list so that I can receive the latest deal in an email."

By applying the 3C concept, which ONE of the following statements is CORRECT?

A.

Conversation should include the acceptance criteria discussion.

B.

The card should contain requirements not the user story.

C.

Product owner has written a user story and confirmation is not needed.

D.

The conversation is not required and the team should start developing.

Full Access
Question # 12

During a retrospective, which of the following items would be the LEAST effective to generate discussions on process improvement?

A.

The build process was slow and this often caused delays waiting for the build to complete.

B.

For the last sprint the estimated and actual effort were much higher than the team capacity.

C.

The automation tests failed frequently without any logs to help in debugging the failure reason.

D.