Question # 49

For the same financial institution in Question 12, with the same requirements and expectations, what would be the most likely investment values used in testing if two-point boundary value analysis is used to design test cases specific to the 13% interest rate equivalence partition?

A.

R100 000, R100 001, R500 000, R500 001.

B.

R99 999, R100 000, R499 999, R500 000.

C.

R100 000. R500 000.

D.

R99 000, R500 001.

Full Access
Question # 50

Metrics can be collected during and at the end of testing activities to assess which of the following?

i. Progress against the planned schedule and budget.

II. Current quality of the test object.

Hi. Adequacy of the test approach.

iv. Effectiveness of the test activities with respect to the objectives.

v. All the above.

Select the correct answer:

A.

Only i and ii.

B.

Only i and iii.

C.

Only I, ii and iv.

D.

Only v.

Full Access
Question # 51

An alphanumeric password must be between 4 and 7 characters long and must contain at least one numeric character, one capital (uppercase) letter and one lowercase letter of the alphabet.

Which one of the following sets of test cases represents the correct outcome of a two-value boundary value analysis applied to the password length? (Note: test cases are separated by a semicolon)

A.

1xA;aB11;Pq1ZZab;7iDD0a1x

B.

aB11;99rSp:5NnN10;7iDD0a1x

C.

1xB: aB11: 99rSp: 5NnN10; 4NnN10T; 44ghWn19

D.

1RhT;rSp53;3N3e10;8sBdby

Full Access
Question # 52

A program is used to control a manufacturing line (turn machines on and off. start and stop conveyer belts, add raw materials to the flow. etc.). Not all actions are possible at all times. For example, there are certain manufacturing stages that cannot be stopped - unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action is not allowed) are covered by the tests.

Which coverage metric will provide the needed information for this analysis?

A.

Code coverage

B.

Data flow coverage

C.

Statement coverage

D.

Branch Coverage

Full Access
Question # 53

The following chart represents metrics related to testing of a project that was competed. Indicate what is represented by tie lines A, B and the axes X.Y

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 54

During component testing of a program if 100% decision coverage is achieved, which of the following coverage criteria is also guaranteed to be 100%?

A.

100% Stale transition coverage

B.

100% Equivalence class coverage

C.

100% Boundary value coverage

D.

100% Statement coverage

Full Access
Question # 55

Which of the following types of tools is BEST suited for determining source code compliance with the guidelines provided by a coding standard?

A.

Containerisation tool

B.

Fault seeding tool.

C.

Static analysis tool.

D.

Test data preparation tool

Full Access
Question # 56

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

Full Access
Go to page: