Question # 4

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase? 1 credit

A.

Acceptance testing to verify the business process

B.

Acceptance testing to verify operational requirements

C.

Requirements testing as part of testing regulatory compliance

D.

Another system test cycle to verify defect resolution

Full Access
Question # 5

During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit

A.

ISO 9126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

B.

ISA 4126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

C.

BS-7925-2 ‘Software testing. Software component testing is a national standard used internationally. It covers a number of testing techniques that may be useful both on component testing level and on system testing level.

D.

SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard adapted from a national one. Besides hospital software, this standard ought to be used also by other types of software system in the region.

E.

IEEE 829 ‘standard for software test documentation’ is an international standard to be following mandatory by all testing origination regardless of lifecycle models.

Full Access
Question # 6

Select THREE issues from the options provided that should at least be raised. 1 credit

A.

Has there been sufficient comparison of tools?

B.

What are the problems we are trying to address?

C.

Do we have a set of tool requirements to validate the tool against?

D.

How will the implementation be organized?

E.

Which project will be selected to perform the tool pilot?

F.

Is customized training available?

G.

How will the change process be managed?

Full Access
Question # 7

Which of the following would you least expect to form part of the analysis of initial tool costs? 1 credit

A.

Integration with other tools

B.

Learning time required to use the new tool

C.

Tool portability

D.

Evaluation of suitable tools

Full Access
Question # 8

Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:

a. Any deviation from the procedures described in the test

b. strategy document

c. The overall estimated costs, timescales and resource

d. requirements

e. A detailed schedule of testing activities

f. The development deliverables to be tested

g. Which test staff members (names) will be involved and when

h. Level of requirements coverage achieved

Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit

A.

a

B.

b

C.

c

D.

d

E.

e

F.

f

Full Access