An engineer needs to install an additional PSU on an existing, single PSU Dell EMC PowerEdge R740. They complete the initial installation and cabling procedures. They connect an AC cable and the power distribution unit produces normal AC output. The engineer checks power management and sees that the new PSU is in the Failed state.
What task should be completed to troubleshoot this issue?
You are Investigating a disk error on a Dell EMC PowerEdge server and discover a Hot Spare has not been assigned to the Virtual Disk Group. Use the simulator to assign the Global Hot Spare. When you have finished using the simulator, dick Next.
A technician is sent on-site to troubleshoot a server that produced an error message during the most recent POST, but then completed the POST and booted to the operating system. The user cannot remember the specific error and no entry was made in the error log relating to this error.
How can the technician find out what the error message was?
For a temporary migration task the CPU core count on the Dell EMC PowerEdge R640 server needs to be reduced to 8 because the installed application will not work due to license restrictions. Use the simulator to apply the change so the application can be installed.
When you have finished using the simulator, click Next.
A system engineer has a 14G Dell EMC Poweredge server with an amber light blinking. The engineer must pull a SupportAssist collection before calling Dell Support to evaluate what the potential problem. Use the simulator to collect and view the SupportAssist collection.
For security reasons, the Dell EMC PowerEdge server power button must be disabled. Use the System Setup Utility in the simulator to disable the power button. When you have finished using the simulator, click Next.