H12-411_V2.0 Exam Dumps - HCIA-Data Center Facility V2.0

Go to page:
Question # 4

The following air conditioners do not need to install cooling towers.

A.

Air-cooled direct expansion air conditioner

B.

Water-cooled air conditioner

C.

Air-cooled chilled water air conditioner

D.

Water-cooled chilled water air conditioner

Full Access
Question # 5

Under the same load conditions,ups The backup time is mainly determined by the battery capacity and the number of battery cells. The larger the battery capacity, the longer the backup time.

A.

True

B.

False

Full Access
Question # 6

During the construction process, carry out low-voltage live work ____________, should be used ____________ .

Full Access
Question # 7

During the implementation process, corrosive operations should be used ____________ .

Full Access
Question # 8

TN-S The three-phase unbalanced current in the low-voltage power distribution system makes the protection line PS Generate voltage to ground.

A.

True

B.

False

Full Access