Which of the following interface be found in RTN 910A System Control, Switching, and Timing Board ?
Multimeter can be used to check whether the antenna aligning are correct or not in the process.
Material checking can be ignored during site installation, because completeness check has been performed by dedicated personnel before material are delivered to the site.
After an antenna was hoisted to the tower, the lifting rope can be lefle antenna.