Your customer needs a server a maximum Of two processors that will provide high performance, manageability, expansion, and security.
Which server should you recommend?
When designing new server environments, you need to determine the maximum equipment wattage and thermal requirements at the unit (chassis) and rack level.
Which HPE tool should be used?
Your customer needs to add a new server to the HPE OneView management console.
What is required to ensure the server can be managed by HPE OneView?
Your customer has installed multiple Host Bus Adapters in their server.
What feature is now available to be configured?
Match the RAID level with its capacity overhead. (Each option may be used once, more than once, or not at all.)
What is required to use remote management in a HPE ProLiant MicroServer Genl 0 Plus Server?