Question # 9

You hired a junior engineer to assist you with a large-scale network infrastructure project. The engineer has never worked on such a complex project 'ants to better understand the role that each role that each stakeholder will play in the project.

March the stakeholder title to the responsibilities that would most likely apply to their role.

Full Access
Question # 10

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing trie security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They nave heard about dynamic segmentation and central and decentral overlay networks.

What would you advise as the most cost-efficient solution?

A.

Standardize on Aruba 6000 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

B.

Standardize on Aruba 6100 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

C.

Standardize on Aruba 6300 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

D.

Standardize on Aruba 6200 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

Full Access
Question # 11

it has been identified that the client's existing network is having to retransmit packets due to possible hardware or configuration issues. A review of hardware configuration and transport reliability will need to be assessed prior to completing the new design.

What should this phenomenon be classified as?

A)

B)

C)

A.

OptionA

B.

OptionB

C.

OptionC

Full Access
Question # 12

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

Based on the best practices, what should you recommend as the correct optic type for the connection between the IDF and the cabins?

A.

Aruba 106 SFP- LC LRM 220 m MMF Transceiver

B.

Aruba 10GBASE-T SFP- RJ--35 30 m Cat6A Transceiver

C.

Aruba 106 SFP- LC SR 300 m MMF Transceiver

D.

Aruba 10G LC BiDi 40 km-D 1330/1270 XCVR

Full Access
Question # 13

The clients existing network isexperiencing trouble with voice occasionally dropping out on phone calls between office locations, it Is determined that no packet loss is occurring and QOS is likely the cause. With what phenomenon Is the client currently experiencing issues?

A)

B)

C)

A.

Option A

B.

Option B

C.

Option C

Full Access
Question # 14

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would take to ensure redundant RADIUS resources in each of their three geographical regions (AMER. EMEA. and APAC) A large office location Is available In each region with sufficient VMware resources available.

- Each region has 5.000 clients, all of which will need to do either 802.1 x wired or wireless authentications as well as 802.1 x authentication for a single personal device on Wi-Fi.

• All of the non-personal devices will also need to validate health with a local agent.

• A total of 500 guests are expected to be connected on average with a maximum of 700 simultaneous connections making use of Guest Portal for access to the Internet.

• TACACS authentication will also be configured for a total of 1,200 evenly dispersed NADs.

In order to support virtual IPs and server redundancy in each region how many Virtual Policy Manager Licenses will be needed?

A.

six licenses. C3000V

B.

six licenses. C2000V

C.

three licenses. C3000V

D.

three licenses. C2000V

Full Access
Question # 15

You are responding to the customer's RFP and are at the point of documenting design decisions that were not specified in the RFP or the RFP questions. What are valid examples of assumptions made that should be presented to the customer during the response? (Select three >

A.

The customer has technical staff that is capable of implementing the proposed equipment.

B.

Optional monitoring systems (syslog, How collectors) exist.

C.

Vendor equipment availability will meet customer project timelines.

D.

Sufficient space and power exist to rack and turn up the proposed equipment.

E.

Adequate virtual machine resources exist to successfully install required or optional management systems.

F.

The customer budget Is sufficient to afford the proposed solution.

Full Access
Question # 16

identify the stakeholders when gathering information for the network design and new IDF/MDF design. (Select two.)

A.

Help desk manager

B.

Facility manager

C.

Chief Financial Officer

D.

Network Operations manager