Question # 41

What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?

A.

1.68

B.

2.00

C.

4.00

D.

4.42

Full Access
Question # 42

Assessing process proportion as opposed to evaluating a process with respect to a set target can be done using which of these?

A.

Process proportion equals some value range

B.

Process proportion equals some desired value

C.

Target is current

D.

Proportion of the tail is equal

Full Access
Question # 43

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

A.

Data shift analysis

B.

Outlier analysis methods

C.

Center Line and Control Limits

D.

None of the above

Full Access
Question # 44

For Attribute Data, Process Capability is defined as the average proportion of nonconforming products.

A.

True

B.

False

Full Access
Question # 45

One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?

A.

Y = Z(X2)

B.

Y = f(X3)

C.

Y = f(Xn)

D.

Y = g(X+ 1.5)

Full Access