Question # 4

You are working with a three-stage IP fabric using EBGP for peering.

In this scenario, which two actions are required to implement ECMP? (Choose two.)

A.

Usea load balancing policy applied to the forwarding table as an export policy.

B.

Use a load balancing policy applied to BGP as an export policy.

C.

Use the multipath multiple-as BGP parameter.

D.

Use a load balancing policy applied lo BGP as an import policy.

Full Access
Question # 5

You have designed your fabric in Juniper Apstra prior to deploying the network devices.

Which Apstra element in the Staged tab would be used to assist the team that is installing and cabling the devices?

A.

Connectivity Templates

B.

Virtual Networks table

C.

Managed Devices list

D.

Links table

Full Access
Question # 6

Which three statements describe intent-based analytics? (Choose three.)

A.

It indicates when device operating versions require updating.

B.

It is a real-time information processing pipeline.

C.

It is used to establish network performance baselines.

D.

It alerts the network operator when network performance moves away from the baseline.

E.

It collects information from vendor websites.

Full Access
Question # 7

Which statement is correct about making changes to a predefined device profile in Juniper Apstra?

A.

The changes you make to a predefined device profile will be discarded and overwritten when upgrading the Apstra server version.

B.

The processor load on the Apstra server will be negatively impacted when changes are made to a predefined device profile.

C.

Changing the predefined device profile will also affect deployed devices that use the same profile.

D.

You must reboot the Apstra server after changes are made to a predefined device profile before they will become active.

Full Access
Question # 8

Exhibit.

Referring to the exhibit, what is the minimum information you must add to create a new routing zone?

A.

VRF Name only

B.

VRF Name and Routing policies

C.

VRF Name, VLAN ID.AndVNI

D.

VRF Name, VLAN ID, VNI, Routing Policies

Full Access