Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

LEED-AP-ID+C Exam Dumps - LEED AP Interior Design + Construction (LEED AP ID+C) V4

Go to page:
Question # 9

A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Quality Views

C.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

D.

Energy and Atmosphere Credit, Fundamental Commissioning and Verification

Full Access
Question # 10

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Full Access
Question # 11

Which of the following would achieve an exemplary performance credit?

A.

Conducting two goal setting workshops

B.

Demonstrating a 55% potable water savings

C.

Achieving an 80% parking capacity reduction

D.

Signing a one-year contract for renewable energy

Full Access
Question # 12

Which standard reference can be used to find minimum ventilation rates?

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2010

C.

SCAQMD Rule 1168

D.

ASHRAE 62.1-2010

Full Access
Question # 13

An owner has expressed concerns to the LEED AP about the costs associated with the integrative process. How can the LEED AP relieve the owner's concerns?

A.

The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs

B.

The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative

process, the operational savings will make up for the extra costs

C.

The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after

the design for the construction phase, when it will most likely save costs for the project

D.

The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Full Access
Question # 14

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

A.

Waste stream, total waste, diverted waste, waste to landfill

B.

Waste volume, commingled waste, wood for energy, reused items

C.

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

Full Access
Question # 15

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Full Access
Question # 16

A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?

A.

Unattempt the credit

B.

Submit documentation as is

C.

Request that the room be repainted with compliant paint

D.

Obtain current certifications for the wall and ceiling paints

Full Access
Go to page: