According to the LEED Minimum Program Requirements (MPR) specifying minimum occupancy rates, a project must serve how many occupants?
A firm has been hired to renovate an existing office building and wants to increase the number of points the project receives for Location and Transportation credits. What strategy might the firm recommend?
In an effort to preserve the aquatic habitat and natural stream morphology of a fresh-water stream located downstream of a project boundary, one should consider which of the following strategies?
The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?
Who is the most responsible for monitoring ongoing energy performance over the life of the building?
A civil engineer would like to incorporate strategies for rainwater management in order to prevent the flooding occurring at the project site. Which design technique should be used to help prevent stormwater damage to the building and surrounding site?