Question # 9

According to the LEED Minimum Program Requirements (MPR) specifying minimum occupancy rates, a project must serve how many occupants?

A.

One or more Full Time Equivalents (FTEs)

B.

Five FTEs for six months

C.

50% of occupancy based on code

D.

At least two FTEs, no later than SIX months after Commissioning (Cx)

Full Access
Question # 10

A firm has been hired to renovate an existing office building and wants to increase the number of points the project receives for Location and Transportation credits. What strategy might the firm recommend?

A.

Shade the large open parking area with a solar-paneled canopy

B.

Include subsidies for carpools

C.

Replace traditional paving on the parking lot with pervious surfacing

D.

Reduce the building's footprint on the site

Full Access
Question # 11

In an effort to preserve the aquatic habitat and natural stream morphology of a fresh-water stream located downstream of a project boundary, one should consider which of the following strategies?

A.

Minimize pervious surfaces, enhance native vegetation and capture and reuse rainwater

B.

Minimize impervious surfaces, enhance native vegetation and capture and reuse rainwater

C.

Minimize pervious surfaces, implement low-impact development strategies and mimic natural systems

D.

Minimize impervious surfaces, implement high-impact development strategies and mimic natural systems

Full Access
Question # 12

The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?

A.

Allow the LEED Project Administrator sole responsibility to review the appropriate rating system for the project

B.

Select LEED for Schools New Construction and Major Renovations Rating System, as this project is classified as a school

C.

Select LEED for Existing Buildings: Operations and Maintenance Rating System, as the Operational and Maintenance phase has begun

D.

Review the appropriate rating system and determine the best adaptation to use with consultation from U.S. Green Building Council

Full Access
Question # 13

Which is an example of a low-cost Water Efficiency strategy?

A.

Install new flush valves or flow restrictors

B.

Install subsurface cisterns to collect stormwater

C.

Use only compostable toilets throughout the facility

D.

Incorporate an on-site blackwater treatment system

Full Access
Question # 14

Who is the most responsible for monitoring ongoing energy performance over the life of the building?

A.

LEED AP

B.

Contractor

C.

Facility Manager

D.

Commissioning (Cx) Agent

Full Access
Question # 15

Utilizing recycled materials achieves the green building objective of

A.

minimizing the need for landfills

B.

promoting the use of virgin materials and resources

C.

encouraging environmentally responsible forest management

D.

increasing demand for products extracted and manufactured within the region

Full Access
Question # 16

A civil engineer would like to incorporate strategies for rainwater management in order to prevent the flooding occurring at the project site. Which design technique should be used to help prevent stormwater damage to the building and surrounding site?

A.

Install a bioswale

B.

Direct runoff into a stream

C.

Pave the site with high Solar Reflectance Index (SRI) material

D.

Pave the site with impervious material

Full Access