Question # 4

An API has been updated in Anypoint exchange by its API producer from version 3.1.1 to 3.2.0 following accepted semantic versioning practices and the changes have been communicated via the APIs public portal. The API endpoint does NOT change in the new version. How should the developer of an API client respond to this change?

A.

The API producer should be requested to run the old version in parallel with the new one

B.

The API producer should be contacted to understand the change to existing functionality

C.

The API client code only needs to be changed if it needs to take advantage of the new features

D.

The API clients need to update the code on their side and need to do full regression

Full Access
Question # 5

A Mule application exposes an HTTPS endpoint and is deployed to the CloudHub Shared Worker Cloud. All traffic to that Mule application must stay inside the AWS VPC.

To what TCP port do API invocations to that Mule application need to be sent?

A.

443

B.

8081

C.

8091

D.

8082

Full Access
Question # 6

To minimize operation costs, a customer wants to use a CloudHub 1.0 solution. The customer's requirements are:

* Separate resources with two Business groups

* High-availability (HA) for all APIs

* Route traffic via Dedicated load balancer (DLBs)

* Separate environments into production and non-production

Which solution meets the customer's needs?

A.

One production and one non-production Virtual Private Cloud (VPC).

Use availability zones to differentiate between Business groups.

Allocate maximum CIDR per VPCs to ensure HA across availability zones

B.

One production and one non-production Virtual Private Cloud (VPC) per Business group.

Minimize CIDR aligning with projected application total.

Choose a MuleSoft CloudHub 1.0 region with multiple availability zones.

Deploy multiple workers for HA,

C.

One production and one non-production Virtual Private Cloud (VPC) per Business group.

Minimize CIDR aligning with projected application total.

Divide availability zones during deployment of APIs for HA.

D.

One production and one non-production Virtual Private Claud (VPC).

Configure subnet to differentiate between business groups.

Allocate maximum CIDR per VPCs to make it easier to add Child groups.

Span VPC to cover three availability zones.

Full Access
Question # 7

Refer to the exhibit.

What is the best way to decompose one end-to-end business process into a collaboration of Experience, Process, and System APIs?

A) Handle customizations for the end-user application at the Process API level rather than the Experience API level

B) Allow System APIs to return data that is NOT currently required by the identified Process or Experience APIs

C) Always use a tiered approach by creating exactly one API for each of the 3 layers (Experience, Process and System APIs)

D) Use a Process API to orchestrate calls to multiple System APIs, but NOT to other Process APIs

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 8

Refer to the exhibit.

What is a valid API in the sense of API-led connectivity and application networks?

A) Java RMI over TCP

B) Java RMI over TCP

C) CORBA over HOP

D) XML over UDP

A.

Option A

B.

Option B

C.

Option C

D.

Option D