Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

Note! Following NCS_20022101010 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

NCS_20022101010 Exam Dumps - NCSS 2G RA OaM 2.2

Go to page:
Question # 4

Nethawk is used on which interface to check sync loss problems on PCU?

A.

A interface.

B.

Abis Interface.

C.

GB Interface.

D.

Ater Interface.

Full Access
Question # 5

Which of the following is NOT a GSM basic service?

A.

Asynchronous data transmission for circuit switched with data rate of 9.600 bps.

B.

Short message service.

C.

Call forwarding.

D.

Fax transmission.

Full Access
Question # 6

What is Remote Electrical Tilting (RET) in a BTS site?

A.

Remote Electrical Tilting (RET) provides increased efficiency for optimization and minimized site visits, as antenna tilting can be arranged by electric means remotely. 2G Flexi BTS Site Manager can only show the commission RET units, nothing else.

B.

Remote Electrical Tilting (RET) provides increased efficiency for optimization and minimized site visits, as antenna tilting can be arranged by electric means remotely. Using the 2G Flexi BTS Site Manager, users can commission the RET devices via GUI.

C.

Remote Electrical Tilting (RET) is a technology designed only for Flexi Multiradio BTS Active Antenna System.

D.

Remote Electrical Tilting (RET) provides increased efficiency for optimization and minimized site visits, as antenna tilting can be arranged by electric means remotely. This feature does not support BTS configurations in concurrent mode.

Full Access
Question # 7

How can we look up the available BTS software in the BSC?

A.

ZEWL.

B.

ZEEI.

C.

ZWQO.

D.

ZEWI.

Full Access
Question # 8

What is the maximum transmission rate for EDGE?

A.

69,2 kbit/s.

B.

171,2 kbit/s.

C.

553,6 kbit/s.

D.

2 Mbit/s.

Full Access
Go to page: