Question # 33

Which of the following is NOT a source of electromagnetic interference (EMI)?

A.

Copiers

B.

Transformers

C.

Incandescent lights

D.

Fluorescent lights

E.

Electrical power supply cable

Full Access
Question # 34

You have discovered a common mode current on the metallic cable sheaths of your building riser cables. What is the MOST likely cause for you to investigate?

A.

Lack of cable protection

B.

Two separate and distinct ground references

C.

Improper secondary protection

D.

Improper physical protection of cable

E.

Improper placement and/or termination of cables

Full Access
Question # 35

You are working on the design of a new, large ER/TR that will contain many racks and data cabinets including a large UPS system. Your recommendation to the architect for room access from inside the building is:

A.

Two 0.9 m (3 ft) solid doors

B.

One 1.5 m (5 ft) metallic roll top door

C.

One 1.2 m (4 ft) solid core, steel sheath door

D.

One 1.83 m (6 ft) solid core dual direction sliding door with removable sides

E.

One double door with a removable center post

Full Access
Question # 36

Which of the following types of conduit uses set screw couplings and connectors?

A.

RMC

B.

EMT

C.

IMC

D.

Schedule 80 PVC

Full Access
Question # 37

You have been selected to do the telecommunications design on a new, single story building. The architect requires the size and location of the telecommunications rooms so their building design can proceed. From the items listed below (all of which are required for the design), which one is the logical starting point in order to provide the architect with a size and location for the room?

A.

Determine where the entrance facility will be

B.

Determine the number of , their locations, and telecommunications services needed

C.

Determine the power, HVAC, electrical, and security requirements for the room

D.

Determine future growth and other requirements

E.

Determine the types of equipment to be installed in the room

Full Access
Question # 38

You are designing a cabling containment system installed overhead in a new data center. The main or prime purpose of the system will be to manage fiber optic cabling between cabinets. You have a choice of designs of the containment system. In view of the prime purpose of containment system, your first choice of design will be one that:

A.

Has a bottom design with a web spacing of less than 203 mm (8 in)

B.

Has a bottom design with a web spacing of less than 152 mm (6 in)

C.

Is manufactured with a soft cloth type material

D.

Has a solid bottom design

E.

The design is not important as long as the client pre approves the manufacturer

Full Access
Question # 39

You have been asked to spec the physical security requirements related to the protection of assets for a new data center. The most common potential for damage categories you have considered include temperature, gases, organisms and projectiles. The one category that you have missed is:

A.

Aircraft flight paths

B.

Proximity to high speed rail links

C.

Liquids

D.

Parking lot exits

E.

Exposure to extreme winds

Full Access
Question # 40

Which of the following is NOT an element of a cable system?

A.

Headend

B.

Distribution system

C.

Subscriber drop

D.

Television

Full Access