Veeam Financial Services performed a proof of concept of the design outlined in the architecture. Backups completed successfully, but it was determined that the offloading of data to public cloud storage is consuming all available bandwidth on several branch sites and business applications are lacking performance as a result. What adjustments within the Veeam Infrastructure would best address this issue?
Based on documented requirements, which information is still needed for a complete architectural design?
What things can you do to validate that the design meets target SLAs and reduces the headcount required to manage the solution? (Choose 3)
While examining the requirements for archived backups, you notice that a copy should go to a cloud
provider. Which of the stated requirements needs additional information to help clarify the
customer expectation?
Veeam Financial Services received notification from their legal team that retention of backups should be five years on-site instead of four. What component sizing should be adjusted?
When talking to someone who works for the customer, they mention they are working on a different project with a major cloud provider that does not currently support immutability. Which of the following is the best option to still satisfy the requirement for offsite, immutable or air gapped backups if that cloud provider is selected for archive storage?
While examining the details for the remote sites each with a single server, you are trying to determine if a local repository will be needed or if backups can be transferred back to the central corporate site in the region. Which of the following requirements will act as a constraint on your decision?