An administrator needs to dynamically add VMware VMs that have a custom application installed to a backup job. How can this job be created?
On Monday, a backup administrator found out that some backup jobs were missing from a configuration. They want to roll back the configuration database to Friday's state. Which configuration restore mode should be used?
An administrator needs to create a strategy in advance of a disaster to ensure that applications can be started in a specific order. How can this be accomplished?
The engineer configured Veeam Backup & Replications 3 years ago with an all-in-one physical server with one job backing up all VMs. The environment grew considerably and RPOs are no longer met.
The engineer checks the backup job and sees:
Load: Source 0% > Proxy 68% > Network 0% > Target 0%.
What should be done to decrease the backup processing time?
An environment is using Veeam Agent for Microsoft Windows and has Microsoft Exchange 2016 with regular database availability groups (DAGs) configured. What option is required to properly back up the databases?