Question # 49

An engineer is performing an AP-on-a-stick survey and ¬nds that the 5 GHz channel overlap is too high when an appropriate number of APs are used for the density requirements. Which two actions during the survey reduce channel overlap? (Choose two.)

A.

Raise the minimum data rate to 24 Mbps.

B.

Increase AP transmit power to improve the SNR.

C.

Allow the use of UNII-2e channels.

D.

Use directional antennas to limit the coverage area of some APs.

E.

Enable power saving mode.

Full Access
Question # 50

A customer is running a guest WLAN with a foreign/export-anchor setup. There is one anchor WLC in the US and two in Europe. Anchor WLC priorities are used to prefer local anchors. During a routine network audit, it is discovered that a large number of guest client sessions in the US are anchored to the WLCs in Europe. Which

reason explains this behavior?

A.

The foreign WLC failed and recovered.

B.

The US anchor WLC failed and recovered.

C.

The US anchor WLC is anchored to itself with a priority value of zero.

D.

The anchor WLC is in the same mobility group.

Full Access
Question # 51

A 60,000-square-foot outdoor area must be surveyed. The survey must be completed in the least amount of time. Which tool or equipment is used when performing the site survey?

A.

additional access points that use sniffer mode

B.

site survey tool that has modules in sniffer mode

C.

Additional access points that use GPS mode

D.

site survey tool that has a GPS module

Full Access
Question # 52

Which three pieces of equipment are needed to conduct a fully measured wireless survey? (Choose three.)

A.

PoE battery

B.

spirit level

C.

access point

D.

tall tripod

E.

goggles

F.

ladder

Full Access
Question # 53

A customer has multiple WLCs running N+1 redundancy with APs equally distributed. Only one WLC is a designated backup for all other WLCs so the customer must ensure that the most critical APs remain registered or get priority over other APs in case of a WLC failure. However, the customer notices on WLC failure that some critical APs remain unregistered What needs to be addressed in the design?

A.

AP fallback is not enabled on the backup WLC.

B.

AP failover priority is not enabled globally on the backup WLC.

C.

AP failover priority is not enabled globally on the failed WLC.

D.

AP fallback is not enabled on the failed WLC.

Full Access
Question # 54

An engineer must create data-link redundancy for the company’s Cisco Wireless LAN Controller. The engineer has decided to configure LAG-based redundancy instead of port-based redundancy. Which three features of LAG-based redundancy influenced this decision? (Choose three.)

A.

Packets are always sent out on the same port they are received on.

B.

All interface traffic passes as long as one port is up.

C.

The same port has multiple untagged dynamics interfaces.

D.

Interface connection to two separate nonstacked switches is available.

E.

Full bandwidth of all links is available.

F.

Ports are grouped into multiple LAGs.

Full Access
Question # 55

An engineer has successfully configured high availability and SSO using two Cisco 5508 Wireless LAN Controllers. The engineer can access the Active Primary WLC, but the Secondary Standby WLC is not accessible. Which two methods allow access to the standby unit? (Choose two.)

A.

via the console connection

B.

SSH to the redundancy management interface of the primary WLC

C.

SSH to the service port interface

D.

SSH to the virtual interface of the secondary WLC

E.

SSH to the management interface of the primary WLC

Full Access
Question # 56

A customer uses a Cisco 5520 WLC that is connected via a single 10-GB interface to manage the wireless network. The wireless network

includes 500 APs for the campus network. The customer wants to add 300 APs and is concerned about traffic load and lack of redundancy. The purchase of a second controller is not an option. Which design approach mitigates the customer concerns?

A.

Connect a second 10-GB interface on the WLC and set the port as a secondary port.

B.

Connect a second 10-GB interface on the WLC and implement LAG.

C.

Implement a vWLC and configure SSO with the WLC.

D.

Implement a vWLC and configure N+1 redundancy with the WLC.