Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

AD01 Exam Dumps - Blue Prism Accredited Developer Exam

Go to page:
Question # 33

Consider the following process flow:

Decision "A" properties are:

Decision "B" properties are:

Decision "C" properties are:

What will happen when the process runs?

A.

The flow will pass through calculation stage "A"

B.

The flow will pass through calculation stage "B"

C.

The flow will pass through calculation stage "C"

D.

An exception will be thrown

Full Access
Question # 34

Examine the following diagram which has been extracted from a Blue Prism Process currently being tested in Process Studio

The Request Type is a text data item and will contain a text value which categorizes the type of request being processed. The Process Request stage has been assigned a Breakpoint with the following Breakpoint condition:

What will happen if you press the Go button when debugging the Process?

A.

If the 'Request Type' value equals "New Card", then the Process will stop at the Breakpoint on the 'Process Request' stage

B.

If the 'Request Type' value equals "New Card" then the Process will flow to the End stage without stopping

C.

Breakpoints are unconditional therefore the Process flow will always stop at the 'Process Request' stage

D.

If the 'Request Type' value is not equal to "New Card", then the Process will stop at the Breakpoint on the 'Process Request' stage

Full Access
Question # 35

A Developer is unable to pass Collection data as an Input Parameter because the Collection is not visible under available Data Items What is the reason for this issue?

A.

The referenced Collection is not set to global

B.

There is a block surrounding the Collection

C.

There are more than four fields in the Collection

D.

The Collection fields are not defined

Full Access
Question # 36

There are multiple rows of conditions in the Properties window of the Wait Stage. Which of the following is TRUE?

A.

The Wait Stage will sequentially check each condition, it does not require all conditions to be met

B.

If all conditions are met before the TimeOut penrid expires, the process will continue

C.

If no conditions are met, an internal error will appear and terminate the process

D.

The Wait Stage will simultaneously check all conditions and follow the logic of whichever condition is met first

Full Access
Question # 37

Examine the following extract taken from an Action in Object Studio:

What will happen if an Exception occurs in the ‘Read Nasdaq Data’ stage?

A.

The 'Nasdaq Error1 Recover stage will receive Error1 Exceptions, and the 'Nasdaq Error2' Recover stage will receive Error2 Exceptions

B.

The 'Nasdaq Error’ Recover stage will receive the Exception as stages and the order of priority are decided using the stage name, which are sorted in ascending order

C.

An Exception Block will allow multiple Recover stages to be placed in the block, however only one of them will be responsive to receiving exceptions, therefore it is impossible to predict what will happen

D.

The 'Nasdaq Error2' Recover stage will receive the Exception as it placed above the 'Nasdaq1 Error' Recover stage in the Action flow

E.

An Internal Exception will be thrown as an Exception Block cannot contain 2 blocks

Full Access
Question # 38

Study the following Action flow in a Blue Prism Business Object:

Which of the following statements are true about this flow'?

A.

If during testing the Action flow completes as expected, then no additional Wait stages are required as this will slow down the execution of the Acton flow

B.

A single intelligent Wait stage should be added between the 'Start' stage and the "Write Customer ID' stage to correct this Action

C.

To correct this Action, intelligent Wait stages should be added after the start stage and after any stage that will cause the application we are interfacing with to change

D.

Intelligent Wait stages should be added after every stage in the flow (i.e. after any Navigate Write or Read stages), to correct this Action

Full Access
Question # 39

Which of the following statements regarding the use of Work Queues are correct? (select 2 responses)

A.

Control Room allows filtering of the displayed queue items using exact tags and by using wildcards

B.

Wildcards are not allowed in the Tag Fitter property of the Work Queues business object Get Next Item action

C.

Work Queue item Status can only be set to Completed or Exception

D.

Tags can be used allow flexibility in the order items are worked within a single Work Queue

Full Access
Question # 40

When considering an element's attributes in Application Modeller which of the following statements are true? (select all that apply)

A.

The attributes are provided to Blue Prism by the Target System

B.

The initial selection of attributes made by Blue Prism will always be the optimum attribute set for the element

C.

The list of attributes may vary from application type to application type

D.

Selected attributes are shown as ticks in the Match column of Application Modeller

Full Access
Go to page: