Question # 17

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

A.

By Plant

B.

By Period

C.

By Industry

D.

By Material Status

Full Access
Question # 18

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

A.

Fill up to the maximum stock level.

B.

Fill up to the safety stock level.

C.

Fill up based on the lot size procedure.

D.

Fill up to the reorder stock level.

Full Access
Question # 19

Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

A.

To increase the number of planning levels

B.

To simplify the structure of bills of material

C.

To reduce the number of material masters

D.

To make the assignment of components easier

E.

To reduce the number of changes required in bills of material

Full Access
Question # 20

Which of the following elements does MRP take into account during net requirement

calculation? Note:

There are 2 correct answers to this question.

A.

Forecast key figures

B.

Safety Stock

C.

Maximum stock level

D.

Purchase orders

Full Access
Question # 21

What are the options if the Dispatched operation status is set for a production order operation?

Note: There are 2 correct answers to this question.

A.

You can reschedule the operation using finite scheduling in a planning table.

B.

You can reschedule the operation in the Manage Production Operations app.

C.

You can reschedule the operation using infinite scheduling in a planning table

D.

You can reschedule the operation using midpoint scheduling in a planning table.

Full Access
Question # 22

Which time elements can be reduced by a reduction strategy?

Note: There are 3 correct answers to this question.

A.

Goods receipt processing time

B.

Move time

C.

Wait time

D.

Float after production

E.

Queue time

Full Access
Question # 23

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

A.

Resource matrix

B.

Resource network

C.

Resource hierarchy

D.

Resource selection

Full Access
Question # 24

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?

Note: There are 2 Correct answers to this question?

A.

Run MRP with quota arrangement

B.

Run PP/DS heuristic for repetitive manufacturing

C.

Assign planned orders manually in the planning table

D.

Assign planned orders manually in the planning table

Full Access