What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
Which time elements are relevant for lead time scheduling of a production order? Note:
There are 2 correct answers to this question.
Which master data object governs the relationship between supply source and demand source in the Kanban process?
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
What does the material type influence?
Note: There are 2 correct answers to this question.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
How can you set up the supply source for the Kanban process in SAP S/4HANA?
Note: There are 3 correct answers to this question.
You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
Which of the following elements does MRP take into account during net requirement
calculation? Note:
There are 2 correct answers to this question.
What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question.
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?