An existing Dell EMC customer wants to deploy a new VxRail cluster on premise. Each node of the new
cluster will be configured with a single disk group containing one 1.6 TB Flash drive for the capacity tier. The customer plans on using mirroring and needs to have at least 2 TB of usable capacity in the vSAN datastore.
What is the minimum number of VxRail nodes required?
A VxRail Model E560 Cluster will be deployed in a 1 GbE network The system is delivered in its largest supported configuration How much space needs to be available to rack all the VxRail nodes?
Which command can be used from VxRail Manager VM to restart the loudmouth daemon?
How long is the grace period for the vSphere evaluation licenses in a new VxRail implementation?
Which vSAN setting is enabled by default during the initial deployment of a VxRail cluster?
A VxRail Stretched Cluster will have four hybrid nodes at each site. What is the recommended storage policy to ensure cross-site and local protection, using storage as efficiently as possible?
In which VxRail node model is the iDRAC ‘NIC Selection Setting’ set to LOM1?