Question # 4

A newly installed VxRail system appears to have poor vSAN performance for all VMs on the cluster.

What can be used to identify the issue?

A.

esxtop with v view

B.

resxtop with d view

C.

esxtop with x view

D.

resxtop with s view

Full Access
Question # 5

What command is used to restart the Loudmouth process on a VxRail node?

A.

/etc/init d/loudmouth restart

B.

/usr/lib/vmware/loudmouth/bin/loudmouthd restart

C.

systemctl restart loudmouth

D.

systemctl restart vmware-loudmouth

Full Access
Question # 6

What type of license does the Doll 4100 OS 10 Switch require to support SmartFabric beyond the initial trial period?

A.

SmartFabric licensing

B.

Feature specific licensing for SmartFabric Services

C.

FullFabric Mode licensing

D.

Porpetual licensing

Full Access
Question # 7

A VxRail Stretched Cluster will be configured with four All-Flash nodes at each site based on the following

requirements:

  • PFTT = 1
  • SFTT = 1
  • FTM = Erasure Coding

Based on the required usable capacity, what should be the planned capacity of the design?

A.

Single Site Capacity = 150%

Total Cluster Capacity = 300%

B.

Single Site Capacity = 133%

Total Cluster Capacity = 266%

C.

Single Site Capacity = 100%

Total Cluster Capacity = 200%

D.

Single Site Capacity = 200%

Total Cluster Capacity = 400%

Full Access
Question # 8

What are all of the menu option choices available in the RASR factory reset procedure when booting from the RASR ISO?

A.

RASR RESET

CREATE RASRUSB

FACTORY RESET

QUIT

B.

RASR RESET

CREATE RASRUSB

FACTORY RESET

REBOOT

UPDATE FIRMWARE

QUIT

C.

RASR RESET

CREATE RASRUSB

FACTORY RESET

UPDATE FIRMWARE

EXIT

D.

RASR RESET

CREATE RASRUSB

FACTORY RESET

REBOOT

UPDATE FIRMWARE

EXIT

Full Access
Question # 9

An existing Dell EMC customer wants to deploy a new VxRail cluster on premise. Each node of the new

cluster will be configured with a single disk group containing one 1.6 TB Flash drive for the capacity tier. The customer plans on using mirroring and needs to have at least 2 TB of usable capacity in the vSAN datastore.

What is the minimum number of VxRail nodes required?

A.

2

B.

3

C.

4

D.

5

Full Access
Question # 10

A VxRail Model E560 Cluster will be deployed in a 1 GbE network The system is delivered in its largest supported configuration How much space needs to be available to rack all the VxRail nodes?

A.

4U

B.

8U

C.

16U

D.

64U

Full Access
Question # 11

Which command can be used from VxRail Manager VM to restart the loudmouth daemon?

A.

systemctl restart loudmouth

B.

/etc/init.d/vmware-loudmouth restart

C.

systemctl restart vmware-loudmouth

D.

/etc/init.d/loudmouth restart

Full Access
Question # 12

How long is the grace period for the vSphere evaluation licenses in a new VxRail implementation?

A.

30 days

B.

45 days

C.

60 days

D.

90 days

Full Access
Question # 13

Which vSAN setting is enabled by default during the initial deployment of a VxRail cluster?

A.

Deduplication and Compression

B.

Performance Service

C.

Storage policy of FTT = 1

D.

Encryption

Full Access
Question # 14

A VxRail Stretched Cluster will have four hybrid nodes at each site. What is the recommended storage policy to ensure cross-site and local protection, using storage as efficiently as possible?

A.

PFTT=1

SFTT=1 FTM=Mirroring

B.

PFTT=1

SFTT=1

FTM=Erasure Coding

C.

PFTT=1 SFTT=0 FTM=Erasure Coding

D.

PFTT-0 SFTT=1

FTM=Mirroring

Full Access
Question # 15

In which VxRail node model is the iDRAC ‘NIC Selection Setting’ set to LOM1?

A.

S570

B.

E560

C.

G410

D.

G560

Full Access
Question # 16

What is used to control remote access to VxRail through SRS?

A.

VxRail Manager

B.

SRS VE Gateway

C.

vCenter

D.

Policy Manager

Full Access
Question # 17

After finishing the rack and stack of a VxRail Model G410 cluster, in which sequence should the nodes be

powered on?

A.

All four at the same time

B.

Any order possible

C.

Forward order (1 - 4)

D.

Reverse order (4 - 1)

Full Access