New Year Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

E_S4HCON2023 Exam Dumps - SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade

Go to page:
Question # 17

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

A.

An upgrade of the software components is performed, without changing the database type.

B.

A change of the database type is performed, without changing the software components.

C.

An SAP S/4HANA conversion is performed, without adapting the customer data.

D.

A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Full Access
Question # 18

In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?

There are 2 correct answers to this question.

Response:

A.

Upgrading to SAP ECC 6.08 without using DMO

B.

Using DMO when applying Support Packages to SAP ECC 6.07

C.

SAP S/4HANA conversion to SAP S/4HANA 1709

D.

Updating to SAP ECC 6.07 using DMO

Full Access
Question # 19

Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

A.

The link to different patch levels to SUM

B.

AA

C.

The corrections to the SUM Guide

D.

An overview about possible upgrade paths

Full Access
Question # 20

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

A.

An additional temporary database is used during uptime

B.

Dedicated application tables are migrated in uptime

C.

TABIMJJPG is executed in uptime

D.

The repository is migrated in uptime

Full Access
Question # 21

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

A.

Depending on the SAP S/4HANA version, there are different SI check frameworks.

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems.

C.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

D.

You need to build up a SI check framework by applying SAP notes.

Full Access
Question # 22

Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?

There are 2 correct answers to this question.

Response:

A.

Create "modified* versions of the objects that you need to adjust

B.

Release the transport request containing the modification adjustment

C.

Assign the transport request as a modification adjustment transport

D.

Manually activate the adjusted dictionary objects

Full Access
Question # 23

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Full Access
Go to page: