Question # 25

First time powering on UPS5000-E, make sure that the UPS main input switch, bypass switch, output switch, maintenance bypass switch and battery switch are all OFF

A.

TRUE

B.

FALSE

Full Access
Question # 26

Depending on different layouts, the batteries can be deployed inside or outside FusionModule2000

A.

TRUE

B.

FALSE

Full Access
Question # 27

When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.

A.

TRUE

B.

FALSE

Full Access
Question # 28

Whether the water distribution unit is equipped or not is based on installation scenarios

A.

TRUE

B.

FALSE

Full Access
Question # 29

On the Current Alarm page of NetEco, filter criteria can’t set to search for the required alarms.

A.

TRUE

B.

FALSE

Full Access
Question # 30

Modular Data Center is on-demand deployment, which avoids over-investment.

A.

TRUE

B.

FALSE

Full Access
Question # 31

The UPS5000 option temperature and humidity sensor does not support cascading

A.

TRUE

B.

FALSE

Full Access
Question # 32

For NetCol5000-A installation, the required time of preserving positive pressure is ( ) hours.

A.

8

B.

12

C.

24

D.

16

Full Access