Question # 4

( ) is the control component of doors in module data center.

A.

Access Actuator

B.

Multi-functional sensor

C.

Skylight actuator

D.

Rack Environment unit

Full Access
Question # 5

After all the NetEco monitoring cables are connected, users need to check ( ).

A.

Power cables and signal cables are bound separately.

B.

Proper redundancy is reserved at connectors of signal cables.

C.

Signal cable connectors are intact.

D.

Proper redundancy is reserved at the turning point for signal cables.

Full Access
Question # 6

By setting the mailbox parameters, the NetEco system will send an email to notify the user according to the set rules.

A.

TRUE

B.

FALSE

Full Access
Question # 7

On the NetEco, the door name can’t be modified.

A.

TRUE

B.

FALSE

Full Access
Question # 8

The NetCol5000-A25 kW supports light load dehumidification.

A.

TRUE

B.

FALSE

Full Access