Question # 4

Are the air conditioners of the Fusion Mod ule800 connected to the back end of UPSs? ()

A.

Yes

B.

No

Full Access
Question # 5

Which of the following problems shall be considered when selecting the UPS cable? (Multiple Choice)

A.

Rated current of the UPS

B.

Rated operating voltage and insulating voltage of the power cable

C.

Voltage drop of the power cable in the route

D.

Number of the parallel cables

Full Access
Question # 6

What are the subcategories of data center energy in the product directory tree on the SCT configurator homepage? (Multiple Choice)

A.

UPS

B.

Air conditioner

C.

PDC

D.

Modular Data Center

Full Access
Question # 7

The UPS5000-E can realize convenient and simple 2N power supply system only by configuring a ().

A.

BSC cable

B.

Synchronized control

C.

BSC control board

D.

Parallel card

Full Access
Question # 8

The UPS5000-E (50 kVA power module) covers only a small floor area of (), which saves the space in the equipment room.

A.

Im2

B.

1.5 m2

C.

0.8 m2

D.

0.5 m2

Full Access