New Year Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

Note! Following HPE6-A45 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

HPE6-A45 Exam Dumps - Implementing Aruba Campus Switching solutions

Go to page:
Question # 25

Refer to the exhibit.

The routing switches shown in the exhibit run OSPF on the links between each other. The commander in the Switch-1 VSF fabric goes down. Traffic is disrupted for several seconds.

What should a network administrator do to support a faster failover in a similar situation?

A.

Configure echo mode BFD on the VLAN that connects Switch-1 and Switch-2.

B.

Add VRRP on the VLAN between Switch-1 and Switch-2.

C.

Configure graceful restart, or nonstop OSPF, on Switch-1 and Switch-2, with a proper timer.

D.

Create a redundant virtual link between Switch-1 and Switch-2.

Full Access
Go to page: