New Year Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

NCSE-Level-1 Exam Dumps - Nutanix Certified Systems Engineer (NCSE): Level 1

Go to page:
Question # 9

During a meeting with a prospect a storage administrator comments that they're currently using 16Gb Fibre Channel for their SAN and believes that 10Gb Ethernet can't provide adequate bandwidth or low latency.

As a followup to the meeting, which Nutanix Bible section would be most helpful in overcoming the storage administrator's objection?

A.

Data locality

B.

Storage Tiering and Prioritization

C.

Cluster Components

D.

Drive Breakdown

E.

Do you have any infrastructure refreshes planned for this year?

Full Access
Question # 10

Refer to the exhibit.

In Sizer, in which two ways can an SE accommodate a specific number of physical host-based software licenses that a customer has available for a project? (Choose two)

A.

Option

B.

Option

C.

Option

D.

Option

E.

Option

F.

Option

Full Access
Question # 11

A large retailer company recently employed a CIO who decided that all operations should be migrated to public cloud offerings. After 7 months, the project was be a failure and determined to the CIO exited. The retailer’s infrastructure consisted of tens of thousand’s of VMs on thousands of hosts supported by dozen of storage arrays. Only 10% of workloads were migrated to public cloud during the CIO’s tenure.

Which open ended discovery questions should the SE ask to determine pain points or gaps? (Choose two)

A.

What challenges triggered the public cloud initiative?

B.

Which public cloud offering(s) are utilized?

C.

Is de-duplication q requirement for your workloads?

D.

What are your end users asking for that you cannot deliver today?

Full Access
Question # 12

In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow.

Which two test plan items should the SE map to POC success criteria?

(Choose two)

A.

Deploy HCIbench to determine maximum IOPS.

B.

Deploy Calm to automate application deployment.

C.

Expand the cluster by adding an additional node.

D.

Use a single interface to manage and monitor the full stack.

E.

Enable all data efficiency settings.

Full Access
Go to page: