A company has a business-critical desktop flow that runs on a single Windows 10 machine. The number of daily runs for the flow has significantly increased recently.
Users report that The time required for the flow to complete is no longer acceptable.
You need to scale the solution.
Which four actions should you perform in sequence? To answer, move the apocopate actions from the list of actions to the answer area and arrange them in the correct order.
You are designing a desktop automation solution.
You must ensure that the automation includes error handling. The solution requires the following logic:
If an action fail in the automation, the flow must be redirected to a different flow.
If a group of action often fail, a specific procedure must occur.
You need to select the error handling method to use for each requirement.
Which error handling method or configuration should use select? To answer, the appropriate error handling method or configuration to the requirement. Each error handling method or configuration may be used once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection in worth one point.
A developer creates a desktop flow.
You need to debug the flows.
Which debugging tools should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You are designing a user interface automation that uses a Power Automate for desktop flow.
The solution must allow you to use wildcard characters including question marks and asterisks to define a window
You need to select the window mode for the automation.
Which window mode should you use?
You are using the Microsoft Power Apps maker portal to begin deployment of a solution. You are preparing for deployment of updates from a test environment to production.
You need to deploy the solution.
Which three actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to configure the RailStatusUpdater cloud flow. What should you do?
You plan to create a Microsoft Visio process diagram.
You need to create the diagram and then export the diagram as a Power Automate flow.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to implement security to resolve the invoice data issue
Which three actions should you perform? Each correct answer presents part of the solution.