What aspect must be taken into account when estimating the development time for a process?
What is the purpose of using a standard business process model and notations when creating a high-level solution design?
Given the blowing diagram how on the process be optimized from the steps perspective?
Exhibit.
Consider the following diagram:
What is the problem with the way the solution architect designed it?
For implementing an unattended transactional process what pre-build UiPath Template is the best fit?
What is the correct flow from a high level design standpoint in UiPath Test Manager1?
Instructions: Drag me Description found on the left and drop on Via correct Step Sequence found on the right.
In the license estimation process, what might indicate the need for additional licenses during the process design stage?