Question # 41

To reduce sound transmission between adjacent spaces, construction plans should specify

A.

interior partition walls with cutouts

B.

alignment of all gypsum board seams

C.

non-hollow core doors for private offices and conference rooms

D.

wall construction with noise isolation class (NIC) of 35 in all spaces

Full Access
Question # 42

Which option best explains the intent of hands-free flushing, hands-free soap dispensers and hands-free hand drying?

A.

improved hygiene by reduced touch points

B.

Reduced splashing to stop the spread of pathogens

C.

Lower susceptibility tor wet skin to become infected than dry skin

D.

Enhanced bathroom availability for individuals of all gender identities

Full Access
Question # 43

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Full Access
Question # 44

A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature. Which of the following should the team implement?

A.

The project is located near a bike network that connects riders to five use types

B.

Long-term bike parking (e.g., bike room) can accommodate at least 2.5% peak visitors

C.

The project is located in an area (zip or postal code) with a minimum Bike Score® of 40

D.

Short-term bike parking (e.g., outdoor bike racks) is available for at least 2.5% of peak visitors

Full Access
Question # 45

A team is seeking to satisfy Feature A01: Air Quality, Part 2: Meet Thresholds for Organic Gases through VOC monitoring for a 87.50O ft2 (8 120 m2) project What is the minimum number of volatile organic compound (VOC) sensors that the project owner must install?

A.

10 VOC sensors

B.

15 VOC sensors

C.

20 VOC censors

D.

25 VOC sensors

Full Access
Question # 46

The food service manager for a corporate headquarters office building is asked to explore alternative sources of food that would meet the requirements of the WELL Building Standardâ„¢ (WELLâ„¢). What recommendation should the WELL AP make that would help the manager meet WELLâ„¢ requirements?

A.

Ensure that at least 20% of products are certified organic

B.

Ensure that at least 50% of products are certified organic

C.

Ensure that at least 20% of products are from a Certified Humane® farm

D.

Ensure that at least 50% of products comes from a WELL Building Certified farm

Full Access
Question # 47

A project successfully received both LEED® and BREEAM® certification. The project's WELL Certification is managed by two WELL APs. How many additional points would the project need to achieve the full score under Innovation?

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Full Access
Question # 48

At a local university, lecturers teaching in an auditorium receive feedback that students experience an echo during class.

The following is some basic information about the auditorium:

. There are a total of 200 fully upholstered seats (10 rows of 20 seats each)

. A fabric covered ceiling is installed, suspended 5 ft. (1.52 m) from the concrete slab above

. 50% of the floor is carpeted, with the other 50% bare concrete finish

. The walls are left as bare concrete

Which of the following design interventions would be most likely to reduce reverberation times in the auditorium?

A.

Remove the first row of seats

B.

Add a sound masking system

C.

Remove carpet to expose the slab floor

D.

Provide a fabric covering over the existing concrete walls

Full Access