Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

CTFL_Syll2018 Exam Dumps - ISTQB Certified Tester Foundation Level (Syllabus 2018)

Go to page:
Question # 97

Which of the following is a correct set of boundary values to test the "Group Size" parameter, as defined by the following statement;

"In a reservation system for groups visiting a small museum, the graphical user interface presents a field asking the number of group members. Group size can be anywhere from 2 to 20 visitors"

A.

0,1,8,21,22

B.

0,1,2,3,10,19,20,21,22

C.

2,3,19,20

D.

1,2,20,21

Full Access
Question # 98

Which of the following tool types is the most useful one for a test manager?

A.

Modeling tool

B.

Static analysis tool

C.

Coverage measurement tool

D.

Defect tracking tool

Full Access
Question # 99

The following sentences refer to the Standard for Software Test Documentation' specification (IEEE 829). Which sentence is correct?

A.

The key to high quality test documentation regimes is strict adherence to this standard

B.

Any deviation from this standard should be approved by management, marketing & development

C.

This test plan outline is relevant for military projects For consumer market projects there is a different specification with fewer items

D.

Most test documentation regimes follow this spec to some degree, with changes done to fit a specific situation or organization

Full Access
Question # 100

Given the following requirement:

Which of the following statements is NOT correct?

A.

7 and 13 are boundary values for the equivalence partition including age 10.

B.

Thursday is a valid input boundary value

C.

A minimum of 6 valid test cases are derived from boundary value analysis based on input age

D.

$3.01 is a valid output boundary value

Full Access
Question # 101

A software company adopts the V-model as their development life cycle. Which of the following contains roles of a tester in this company?

A.

Decide what should be automated, to what degree, and how.

B.

Review test plans and set up test environments.

C.

Coordinate the test strategy with the project managers

D.

Introduce suitable metrics to measure the testing progress

Full Access
Question # 102

Which of the following is correct?

A.

Intrusive test tools are tools that do not exhibit the probe-effect

B.

Testing tools can be used by both developers and testers

C.

Use of testing tools is effective only when done as part of a test automation system

D.

Testing tools allow developers do testing Use of such tools changes the role of the test team

Full Access
Question # 103

The following test cases for a Library Management System are available to test changes made to the functions and data structures associated with borrowers

1. Add a new borrower to the system

2. Update a borrower's data

3. Remove a borrower from the system

4. Loan a book to a borrower

5. Return a book from a borrower

6. Reserve a book for a borrower

7. Send "reservation ready" message to a borrower

Which of the following test sequences represents a possible use case? (a test sequence always start with test #1)

A.

1-4-2-7-5-6-3

B.

1-6-2-5-7-4-3

C.

1-6-4-7-5-3-2

D.

1-2-6-7-4-5-3

Full Access
Question # 104

Testing should provide sufficient information to stakeholders to make informed decisions about the release of the software or system being tested. At which of the following fundamental test process activity the sufficiency of the testing and the resulting information are assessed?

A.

Implementation and execution

B.

Requirements specification

C.

Evaluating exit criteria and reporting.

D.

Analysis and design

Full Access
Go to page: