Question # 9

Refer to the exhibit.

Which statement about this logical JBOD is true?

A.

This logical JBOD can be connected to multiple systems to formulate a snared datastore.

B.

After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created

C.

After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done

D.

This logical JBOD can be presented to the compute nodes in a different frame.

Full Access
Question # 10

Which statement about a new HPE SimpliVity deployment is true?

A.

New HPE SimpliVity deployments gives customer flexible choice of hypervisor

B.

A new HPE SimpliVity node can be a member of multiple dusters

C.

AM new HPE SimpliVity models are software optimized

D.

All new HPE SimpliVity models are based on mid CPUs

Full Access
Question # 11

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

A.

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Full Access
Question # 12

Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed

Which tool should you use to troubleshoot the problem?

A.

HPE One View for VMware vCenter Server to verify if server profile template s property imported and registered

B.

vCenter Server to verify if an OS Bund Plans property defined and has ESXi image uploaded

C.

HPE OneView interface to import an existing cluster using the hypervisor cluster profile functionality.

D.

ILO interlace of a given HPE Synergy compute node to verify whether this node is registered within HPE Oneview.

Full Access
Question # 13

Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

Full Access
Question # 14

Refer to the exhibit.

Which statement about this logical interconnect group is true?

A.

Both modules are located in different frames for redundancy

B.

For an uplink set, ports from different modules can be selected

C.

interconnect modules are installed in interconnect bays 1 and 4

D.

An additional license is required to change the enclosure count

Full Access
Question # 15

Your customer is implementing an HPE Synergy solution based on three frames.

Click each of the ports that can be used to connect satellite modules.

Full Access
Question # 16

A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?

A.

Brocade 32GB Fibre Channel Switch Module for HPE Synergy

B.

HPE virtual Connect SE 32 Gb FC Module for Synergy

C.

HPE Virtual Connect SE 100 Gb F32 Module tor Synergy

D.

HPE Synergy 12 Gb SAS Connection Module