11.11 Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

HPE0-S60 Exam Dumps - Delta - HPE Compute Solutions

Question # 4

What is a limitation when creating a server profile?

A.

BIOS settings can be changed only when UEFI optimized is selected as boot mode

B.

ILO management is limited to the integration with Active Directory or LDAP

C.

Administrator cannot define more than 8 connections within a server profile

D.

It is not possible to create shared volumes on demand through a server profile

Full Access
Question # 5

Your customer needs to move an application from an HPE Synergy 480 Gen10 Compute Module to an HPE Synergy 660 Gen 10 Compute Module. The 480 has a switch that has been manually zoned outside of HPE OneView.

What must the customer do before migrating the application?

A.

Migrate the application to a Logical JBOD and connect it to the new server

B.

Copy the server profile and assign the clone to the new hardware

C.

Edit the server profile and change server hardware type

D.

Create a new server profile template and apply to the new hardware

Full Access
Question # 6

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Full Access
Question # 7

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?

A.

Each compute node must have at least 768GB of memory installed

B.

Interconnect modules that provide SAS connectivity should be moved to the third fabric

C.

Each interconnect module in each fabric must be properly licensed in HPE OneView

D.

Compute nodes must have a second CPU installed to access the second fabric.

Full Access
Question # 8

Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?

A.

HPE OneView method for I/O firmware update procedure

B.

RMC CLI to update I/O and HPE Persistent Memory firmware

C.

HPE OneView IT HPE Persistent Memory firmware must be updated.

D.

HPE SUM if HPE Persistent Memory firmware must be updated

Full Access
Question # 9

Refer to the exhibit.

Which statement about this logical JBOD is true?

A.

This logical JBOD can be connected to multiple systems to formulate a snared datastore.

B.

After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created

C.

After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done

D.

This logical JBOD can be presented to the compute nodes in a different frame.

Full Access
Question # 10

Which statement about a new HPE SimpliVity deployment is true?

A.

New HPE SimpliVity deployments gives customer flexible choice of hypervisor

B.

A new HPE SimpliVity node can be a member of multiple dusters

C.

AM new HPE SimpliVity models are software optimized

D.

All new HPE SimpliVity models are based on mid CPUs

Full Access
Question # 11

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

A.

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Full Access
Question # 12

Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed

Which tool should you use to troubleshoot the problem?

A.

HPE One View for VMware vCenter Server to verify if server profile template s property imported and registered

B.

vCenter Server to verify if an OS Bund Plans property defined and has ESXi image uploaded

C.

HPE OneView interface to import an existing cluster using the hypervisor cluster profile functionality.

D.

ILO interlace of a given HPE Synergy compute node to verify whether this node is registered within HPE Oneview.

Full Access
Question # 13

Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

Full Access
Question # 14

Refer to the exhibit.

Which statement about this logical interconnect group is true?

A.

Both modules are located in different frames for redundancy

B.

For an uplink set, ports from different modules can be selected

C.

interconnect modules are installed in interconnect bays 1 and 4

D.

An additional license is required to change the enclosure count

Full Access
Question # 15

Your customer is implementing an HPE Synergy solution based on three frames.

Click each of the ports that can be used to connect satellite modules.

Full Access
Question # 16

A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?

A.

Brocade 32GB Fibre Channel Switch Module for HPE Synergy

B.

HPE virtual Connect SE 32 Gb FC Module for Synergy

C.

HPE Virtual Connect SE 100 Gb F32 Module tor Synergy

D.

HPE Synergy 12 Gb SAS Connection Module

Full Access
Question # 17

Which compute node parameters are captured within server hardware type?

A.

Number of the CPUs

B.

installed operating system

C.

Mezzanine card configuration

D.

Size of the memory Installed

Full Access
Question # 18

Which statement about an HPE Oneview support dump is true?

A.

Appliance support dump by default contains a logical enclosure support dump

B.

Support dump is a binary file that can be opened only in a dedicated application

C.

Support dump can be created if HPE Virtual Connect modules are installed in the frame

D.

Preview support dump is available only when creating an appliance support dump

Full Access
Question # 19

Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex 280 They plan to manage new components using HPE OneView

What must be done to achieve this goal?

A.

The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView

B.

The customer should deploy an HPE OneView appliance for HPE Superdome Flex management

C.

The customer must add a second Rack Management Controller for HPE Superdome Flex 280

D.

The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy

Full Access
Question # 20

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives

The customer requested the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- An appropriate number of vSAN Standard licenses for each compute node

- One HPE O3940 Storage Module with 40 SSDs - All required cables and options

Which statement about this request is true?

A.

vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses

B.

vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN

C.

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

D.

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.

Full Access
Question # 21

Your customer plans to manage HPE Primera using HPE Oneview

Which storage management tasks can be completed using HPE OneView for this environment?

A.

CPG management

B.

Volume provisioning

C.

Cache management

D.

Replication setup

Full Access
Question # 22

You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support Which interconnects are required to support this connection? (Select two.)

A.

HPE Virtual Connect SE 40Gb F8 Module for HPE Synergy

B.

HPE Virtual Connect SE 16Gb FC Module for HPE Synergy

C.

HPE Virtual Connect SE 100Gb F32 Module for HPE Synergy

D.

HPE Virtual Connect SE 32Gb FC Module for HPE Synergy

E.

Brocade 16Gb Fibfe Channel SAN Switch Module for HPE Synergy

F.

Brocade 32Gb Fibre Channel SAN Switch Module for HPE Synergy

Full Access
Question # 23

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Full Access