Question # 9

A post-occupancy evaluation indicates that occupants are cold during winter months due to the building’s HVAC system not performing according to design. What would have prevented this situation?

A.

commissioning

B.

additional diffusers

C.

a punch (deficiency) list

D.

an underfloor distribution system

Full Access
Question # 10

The purpose of a post-occupancy evaluation is to determine

A.

Compliance with the punch (deficiency) list

B.

The quality of general contractor performance

C.

The completeness of the construction documents

D.

Client satisfaction or dissatisfaction with the project

Full Access
Question # 11

What is the MINIMUM aisle width in retail areas conforming to universal accessibility standards?

A.

32" [813 mm]

B.

36" [914 mm]

C.

42" [1067 mm]

D.

48" [1219 mm]

Full Access
Question # 12

Earthquakes and the loads caused by winds are examples of

A.

Live loads

B.

Dead loads

C.

Static loads

D.

Dynamic loads

Full Access
Question # 13

In addition to the use of carpet on the floor, which of the following methods is the BEST solution to address the need for acoustical privacy in a conference room?

A.

Specify interior partitions to the underside of the deck above, add fiberglass insulation to partitions

B.

Specify an acoustical ceiling tile, insulate and caulk joints between partition and ceiling and at electrical receptacles

C.

Specify interior partitions to 6" [152 mm] above an acoustical ceiling, specify batt insulation over the top, 24" [610 mm] each side

D.

Specify metal stud partitions to the underside of the deck above, 5/8" [16 mm] fire-rated gypsum board covered with Type II vinyl wallcovering

Full Access
Question # 14

A designer has a contract with a client to provide complete contract documents for a tenant build-out. Specifying FF&E is beyond the scope of the contract. The designer makes some general FF&E recommendations to show a systems furniture layout as required by the local code officials. The furniture comes in over the client’s previously undisclosed budget. What should the designer do?

A.

Suggest that the client purchase directly from the manufacturer

B.

Meet with the client and furniture provider to resolve the problems

C.

Research alternate furniture options to bring the budget back in line

D.

Let the client and the furniture provider work out the budget problems

Full Access
Question # 15

Which of the following is MOST likely to require a louvered door?

A.

IT closet

B.

Hotel room

C.

Executive office

D.

Dental exam room

Full Access
Question # 16

What core information should be captured in the design contract to demonstrate a clear understanding of the physical parameters of the project?

A.

Property address, usable square footage [m²], and projected use

B.

Room name, client, and occupant load

C.

Room measurements, drawing references, and furniture requirements

D.

Occupant load, circulation ratio, and building classification