Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

IDPX Exam Dumps - Interior Design Professional Exam

Go to page:
Question # 41

Where allowed by jurisdictional statute, when would an independent interior designer’s seal on drawings be acceptable?

A.

In combination with an architect’s seal on construction documents

B.

On the life-safety section of the construction documents

C.

In combination with a structural engineer’s seal

D.

On non-structural interior construction documents

Full Access
Question # 42

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Full Access
Question # 43

What do written specifications define?

A.

quantity

B.

form

C.

quality

D.

relationship

Full Access
Question # 44

While on site, the designer notices that the glazing subcontractor is installing the storefront system in the wrong finish. What should the designer do?

A.

Report the discrepancy in a memo to the contractor and client

B.

Reach out to the glazing supplier to find out which finish was ordered

C.

Explain the issue at the next owner, architect, contractor (OAC) meeting

D.

Tell the subcontractor to stop their work and explain the issue to the contractor

Full Access
Question # 45

A mock-up is provided after client review of the finishes and systems furniture components. Upon inspection of the mock-up, the client observes that the fabric on the panels does not match their corporate standards. What should the designer do NEXT?

A.

Explain to the client that the mock-up cannot be altered

B.

Verify in the meeting minutes which finishes were selected

C.

Request the furniture dealership to reproduce the mock-up

D.

Review the fabric submittal to ensure it works with the application

Full Access
Question # 46

A restaurant is designated as which occupancy classification?

A.

public: group P-3

B.

business: group B

C.

restaurant: group R

D.

assembly: group A-2

Full Access
Question # 47

Changes made to the contract documents during the bid (tender) process are documented in a(n)

A.

Bulletin

B.

Addendum

C.

Change order

Full Access
Question # 48

The ground floor of a building contains a mixed occupancy with a retail store (9,500 sf [884 m²]) with an adjacent storage space (2,000 sf [186 m²]), a daycare (5,000 sf [465 m²]), and an office (6,000 sf [557 m²]). Based on the chart below, what is the occupant load for this floor?

Occupancy Type

Occupant Load Factor (sf/person)

Retail (Mercantile)

60

Storage

300

Daycare

35

Office (Business)

150

A.

305

B.

368

C.

524

D.

527

Full Access
Go to page: